    Référence: 20060123
    Date de publication: 27 juin 2006

    Promoteur – Intermédiaire Financier

    ENEL Distribuzione Spa (“ED”)

    Lieu

    Description

    A three-year investment programme comprising a large number of individual schemes to expand and modernise ED’s electricity distribution networks. Investments include replacement of overhead lines with underground cables, and other improvements to reduce environmental risk and improve safety.

    Objectifs

    Investments are aimed to renew, reinforce and extend ED’s electricity distribution networks to comply with licence obligations, to provide new customer connections and to improve network quality and reliability. Economic benefits include improved quality and security of supply, reducing system losses and the optimal use of generating capacity, contributing to improvements of the efficiency, quality and reliability of the electricity supply, reducing system losses and thus leading to significant energy savings. Investments will serve to bring quality standards in the south of Italy into line with those currently prevailing in the north of the country as well as bringing standards throughout Italy in general into line with the EU average. These benefits will also be available to new competitors for electricity supply who, since 2000, have had access to the promoter’s network at cost-based tariffs for supply of electrcity to their customers.

    Commentaires

    Electricity.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 600 million.

    Coût total (montant approximatif)

    About EUR 2 650 million.

    Aspects environnementaux

    Investment schemes pertain to Annex II of 97/11/EC EU directive. The project will not include schemes involving EIA procedures or affecting sites of special interest (in particular, Natura 2000 sites). Overall, the environmental impact will be mainly limited to physical disruption during construction works and to the visual impact of overhead lines.

    Passation des marchés

    The promoter’s procurement procedures comply with the 2004/17/EC EU Directive on procurement.

    Statut

    Signé - 27/11/2006

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).