    Référence: 20050254
    Date de publication: 3 avril 2006

    Promoteur – Intermédiaire Financier

    Federal democratic Republic of Ethiopia
    Ministry of Water Resources

    Lieu

    Description

    The project is focused on rehabilitating and extending the water supply and sanitation services in 15 medium-sized towns across Ethiopia. Project definition includes new water sources (construction of 52 boreholes, 1 spring and 1 water surface intakes), the extension of the distribution network (some 215 km of new distribution pipes and mains), the increase of storage capacity (30 new reservoirs representing additional 15 100 m³ of water) and the construction of 182 new public fountains. It also includes technical assistance and a special small loan/grant facility to facilitate universal household access to water.

    The project is a follow-up of a World Bank funded program that has set up individual measures to be implemented for each town based on specific feasibility studies.

    Objectifs

    The project has a clear focus on providing water and limited basic sanitary services to the poor. By significantly augmenting the population (some 500 000 people) with access to drinking water, the project will have a positive impact on health by reducing the risk of waterborne diseases and will contribute to poverty alleviation. The co-financing of the project by the EU Water Facility and the EIB reflects the commitment of the EU institutions in favour of the Millenium Development Goals (2000 -2015) through additional support to sector-related development programmes.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 16.5 million

    Coût total (montant approximatif)

    up to EUR 36.2 million

    Aspects environnementaux

    Given the nature, scale and location of sub-projects, the project does not pose significant risk from an environmental point of view. An environmental Impact Statement (EIS) has been included in the set of feasibility studies for each town, proposing appropriate mitigation measures when necessary. International environmental standards were applied for the EIS.

    The project implements the user-pay principle leading to water savings.

    Passation des marchés

    According to the rules of the EU Water Facility for actions to be implemented through an ACP state, all contracts will be procured according to EDF rules. A special procurement advisor together with the PIU will supervise all tenders and the Bank will retain no-objection rights to all national and international tenders.

    Statut

    Signé - 19/12/2006

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Ethiopie Eau, assainissement