Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20050128
    Date de publication: 6 juin 2005

    Promoteur – Intermédiaire Financier

    Name: Cassa Depositi e Prestiti S.p.A.
    Contact: Dott.ssa A. Esposito: 06.4221.1

    Lieu

    Description

    Framework loan facility to finance various forms of investment schemes including civil works, facilities and equipment, networks for the provision and distribution of public services, and land reclamation works, promoted by owners, managers and concessionaires of public infrastructure.

    • First sub-project : Tramvia di Firenze
      The project consists of the construction of three tramway lines:
    • Line 1: Scandicci-Santa Maria Novella, 7.5 km length.
    • Line 2: Airport-Dom-Piazza della Libertà, 7.3 km length
    • Line 3: Careggi-Fortezza, 3.6 km length.
    • As part of a Concession agreement, the Società Tram di Firenze will operate and maintain the above tramway lines for 30 years.

    Objectifs

    • First sub-project : Tramvia di Firenze
    • The project aims at improving the quality of the public transport system and reducing traffic congestion in the Florence metropolitan area.

    Commentaires

    The main sectors to benefit from the loan are expected to be those relating to infrastructure for water / waste water, gas and power transmission and distribution, urban transport and solid waste disposal.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Of the order of EUR 600 million. Tramvia di Firenze : Up to EUR 110 million

    Coût total (montant approximatif)

    EIB finance will cover up to 50% of total project cost for each allocation. Tramvia di Firenze : Up to EUR 480 million

    Aspects environnementaux

    Complying with EU and national legislation on environmental protection.

    Passation des marchés

    Complying with EU and national procurement procedures.

    • First sub-project : Tramvia di Firenze
    • Line 1 was procured by the local public authorities. Lines 2 and 3 will be procured by the Società Tram di Firenze (Concessionaire), which has been selected by the Municipality of Florence following a competitive process in line with Law 109/194. The compatibility of these procedures with the relevant EU procurement legislation will be verified during appraisal.

    Statut

    Signé - 22/07/2005

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Italie Infrastructure composite