Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20040217
Date de publication: 28 avril 2005

Promoteur – Intermédiaire Financier

Finnish Road Administration (Finnra)

Lieu

Description

The construction and operation of a 50 km section of the E18 motorway between Muurla and Lohja, including seven tunnels, eight interchanges and forty-nine bridge sites.

Objectifs

The new motorway section will complete the missing link between Turku and Helsinki, thus improving the transport efficiency, safety conditions, and environment protection and savings in travel time for local, as well as for international transit traffic, along the E18.

Commentaires

Road Transports.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to EUR 200 million. To be reviewed once the preferred bidder has been appointed. The Bank’s loan would not exceed the usual limits in relation to project cost for this type of project.

Coût total (montant approximatif)

The capital cost is currently estimated to be approximately EUR 360 million, but will be finalized once the preferred bidder has been appointed.

Aspects environnementaux

The project falls within the scope of Annex 1 of the EC Directive 97/11, requiring a full EIA with public consultation, which has already been undertaken.

Passation des marchés

The project will be procured as a Public Private Partnership to design, build, finance and maintain the infrastructure. The payment mechanism will be based on availability and performance payments to the concession company during a 25-year concession. The procurement procedure applied by Finnra is based on Finnish national laws (1505/1992 and 380/1998), which are in accordance with EU Directives. The project was advertised in the Public Procurement Gazette on 11 March 2004, issue 11.2004, and in the Official Journal of the EU, issue S47/2004.

Statut

Signé - 27/10/2005

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Finlande Transports