Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20030513
    Date de publication: 3 mai 2004

    Promoteur – Intermédiaire Financier

    Trelleborgs Hamn AB (The Port of Trelleborg)
    P.O. Box 51
    SE 231 21 Trelleborg

    Lieu

    Description

    The project concerns the modernisation and expansion of existing facilities at the port of Trelleborg, Sweden’s second-largest and most southern port, serving Scandinavia, Germany, (Rostock, Travemünde and Sassnitz), Poland (Gdansk) and the Baltic Rim. It includes, inter alia, the construction of a new passenger terminal, three new ferry berths, ro-ro ramps, new waiting areas for trucks and trailers, new railway access tracks, improvements to the entrance of the port and the establishment of a freight hub centre.

    Objectifs

    The purpose of the project is to rationalise port activities specialised on road-, rail- and ferry transports, to make the handling and loading/unloading procedures of ferries more efficient and to strengthen the role of the port as a logistics node. It should strengthen the competitiveness of the Port of Trelleborg and reinforce its market share in a highly competitive business. The project will therefore contribute to regional economic development. It will also improve maritime links between member states of the EU, in particular between Sweden and Germany/Poland, and promote sea transport in intermodal transportation chains. The port is included in the TENs (Trans-European Transport Networks) guidelines for ports.

    Commentaires

    Port infrastructure.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Approximately SEK 435m (EUR 47m).

    Coût total (montant approximatif)

    Approximately SEK 870m (EUR 95m).

    Aspects environnementaux

    The project falls within the scope of Annex I of the Environment Directive 85/337/EEC as amended by Directive 97/11/EC and relevant national law. An Environmental Impact Assessment (EIA) was undertaken for the project in 2003 and approval by Miljödomstolen (Environmental Court) is expected in July 2004. A two-stage public consultation has taken place for the project; no objections have been raised.

    Passation des marchés

    Procurement procedures applied are in compliance with EU Directives and national legislation.

    Statut

    Signé - 16/11/2004

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Suède Transports