Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20030307
    Date de publication: 1 octobre 2003

    Promoteur – Intermédiaire Financier

    Electricidade dos Açores – EDA SA

    Lieu

    Description

    Design and implementation of additional electricity generation, transmission and distribution capacity. The investments will be located in all nine of the islands making up the Archipelago of the Açores.

    Objectifs

    To meet the expected increase in electricity demand through appropriate increases in plant capacity and strengthening of transmission and distribution networks.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to 50% of total project cost

    Coût total (montant approximatif)

    Estimated at EUR 145 million

    Aspects environnementaux

    The project falls under Annex II of EC Directive 97/11, which will be complied with in full. The project will have a positive effect on the environment through use of efficient generation plant and enhanced use of renewable energy resources.

    Passation des marchés

    Procurement procedures are in compliance with relevant EU directives and national and regional legislation.

    Statut

    Signé - 18/12/2003

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Portugal Énergie