Date de publication: 15 septembre 2003
Promoteur – Intermédiaire Financier
Ceská správa letišt’, s.p. (“CSL”)Lieu
Description
The proposed project comprises the design and construction of a new terminal (Terminal North II) adjacent to the existing one, to be dedicated to future Schengen traffic. It will also include the related improvements to landside/airside infrastructure.
Objectifs
By increasing capacity, the project will contribute significantly to improving air transport links between the EU and the Czech Republic and thus promoting the country’s integration with the existing Member States. It will also facilitate tourism and other economic development in the Czech Republic.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to CZK 9 000 million (approx. EUR 270 million)
Aspects environnementaux
An independent, full EIA has been undertaken based upon outline plans of terminal development. After a public hearing, the recommendations of the assessment were endorsed by the Ministry of Environment on 29 October 2001.
Passation des marchés
All procurement of construction contracts will be carried out using open procedures advertised in the OJEC.
Statut
Signé - 10/04/2003
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).