Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20020468
    Date de publication: 10 mars 2003

    Promoteur – Intermédiaire Financier

    Vienna’s public housing vehicle established by Provincial law, Wiener Wohnen

    Lieu

    Description

    The City of Vienna has adopted a strategic planning strategy with individual local plans lending detailed physical elaboration to policies covering public transport, road and rail networks, new commerce and quality affordable housing to address the problems of urban drift and decentralisation. The upgrading of decaying neighbourhoods and associated dwellings is therefore part of an integrated overall strategy of urban renewal.

    Objectifs

    The schemes, to be selected from eligible components of the promoter’s two-year rehabilitation programme, are expected to make a positive contribution towards social, economic and environmental conditions and reduce the impact of social segregation stemming from below-standard public housing. The project covers the second phase of a continuous investment programme within the context of comprehensive long-term rehabilitation.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    About EUR 110 million.

    Coût total (montant approximatif)

    About EUR 220 million.

    Aspects environnementaux

    As the project consists principally in the upgrading of existing housing stock and public space, there is a priori no need to undertake an Environmental Impact Assessment (EIA) as defined under European Directive 97/11 Annex II. Along with significant improvements in basic sanitation, the dwellings will benefit from improved thermal insulation, to substantially reduce energy consumption. Local neighbourhoods will also benefit from environmental improvements, such as traffic calming measures and landscaping, as part of urban renewal works.

    Passation des marchés

    For those projects put in hand, procurement is of two kinds, those under Services Directive 92/50/EEC and Public Works Directive 93/37/EEC for project works. WW follows established procedures, as verified during the initial phase of the project.

    Statut

    Signé - 15/05/2003

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Autriche Aménagement urbain