Date de publication: 27 juillet 2001
Promoteur – Intermédiaire Financier
Autopista Madrid Sur Concesionaria Española, S.A.Lieu
Description
The project (DBFO) consists of the design, building, financing and operation under a 65 years concession of a new toll motorway between Madrid and Ocaña, as well as three sections of the M-50 non tolled ring-road motorway.
Objectifs
The project forms part of the TEN road network and will also contribute to regional development by improving traffic conditions for transit traffic in the southern area of metropolitan Madrid.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to 50% of the total project cost
Coût total (montant approximatif)
Around EUR 700 million
Aspects environnementaux
The promoter is required to respect the regulations imposed by the Directive 97/11/EC. An Environmental Impact Assessment has been realised. In accordance with its normal procedure, the Bank will ensure that appropriate measures have been taken as regards environmental protection ; in particular special measures for impact mitigation have been clearly identified during the design process.
Passation des marchés
The project was advertised in the Official Journal of the EU on 21.04.2000 in accordance with Directive 93/37/CEE and the concession contract was awarded on 29.12.2000.
Statut
Signé - 27/01/2003
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).