Date de publication: 16 août 2001
Promoteur – Intermédiaire Financier
Slovak Road AdministrationLieu
Description
Construction of 3.9 km of 2x2 lane motorway in the district of Petrzalka in Bratislava, between, the Vienna Road and the Pristavný bridge, on the alignment of an existing highway.
Objectifs
The project will complete a motorway bypass of Bratislava.
Commentaires
Roads.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Estimated at EUR 40 million.
Coût total (montant approximatif)
About EUR 80 million
Aspects environnementaux
The project was the subject of preliminary and in-depth impact studies as well as public enquiry, and has been approved by the Slovak Ministry of Environment. The main negative impacts concern noise and the barrier effect to the local population, and will be adequately mitigated. Positive effects will arise from the reduction of traffic in nearby residential areas. Emissions and noise levels will be monitored after construction to ensure compliance with the legal limits.
Passation des marchés
The works contracts will be procured based on open international tendering.
Statut
Signé - 13/03/2003
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).