    Montant
    100 000 000 €
    Pays
    Secteur(s)
    Islande : 100 000 000 €
    Énergie : 100 000 000 €
    Date(s) de signature
    12/11/2025 : 100 000 000 €

    Fiche récapitulative

    Date de publication
    9 janvier 2025
    Statut
    Référence
    Signé | 12/11/2025
    20240812
    Nom du projet
    Promoteur – Intermédiaire financier
    REYKJAVIK SUSTAINABLE ENERGY INVESTMENTS
    ORKUVEITA REYKJAVIKUR
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 250 million
    EUR 421 million
    Lieu
    Secteur(s)
    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    Description
    Objectifs

    The project comprises the expansion and refurbishment of existing geothermal power plants and the extension and renovation of the district heating and electricity distribution networks in the Reykjavik area during 2025-2029.

    In line with the EU and national energy policies, the project will ensure the security of supply of renewable energy and hot water, as well as will secure and improve the energy efficiency of the corresponding enabling infrastructure. It will also serve the increase in demand for renewable energy and hot water from future housing developments and infrastructure expansion in the Reykjavik area.

    Additionnalité et impact

    The Project will enable increased demand for renewable heat, power and hot water due to ongoing and future economic expansion in the capital area. Concerning the district heating (DH), it will contribute to the increase of sustainable heat generation capacity, and efficient heat transport and connections. By strengthening and extending the electricity distribution network, it will support Reykjavik's expansion and the decarbonisation of the country's economy. These utilities have also been operating for around a century and some sections need to be renovated to maintain security of supply.


    The investments will support the country's carbon neutrality target by 2040, in particular by supporting additional electricity load from the electro-mobility sector. The financing of this programme will also contribute to the Bank's lending priority policy on Energy Efficiency, Securing the enabling infrastructure and Decarbonising Energy supply, as well as on Climate Action (100%).


    EIB financing will contribute to addressing market failures that may result in sub-optimal investments. These include negative environmental externalities and the need to ensure security of electricity and heat/hot water supply, which has valuable public-good attributes. The investment programme will enable the connection of new users, improve the reliability of supply in a context of increasing demand due to population and tourism growth as well as to the electrification of key sectors of the country's economy. Demand lags investment, so full benefits in terms of sales are not expected to materialise during or short-term after the programme implementation.


    The broader social benefit indicator as well as the economic rate of return are rated as Excellent. The Promoter and its utility subsidiary has the necessary experience and capacity to manage the implementation of the programme and operate the assets over the term of the loan.


    EIB, as a reputable IFI, provides a valuable financial contribution to the Borrower, notably to diversify its funding sources outside its local market.

    Aspects environnementaux
    Passation des marchés

    Based on their technical characteristics, the geothermal systems expansion and district heating networks activities fall under Annex II of the Environmental Impact Assessment Directive 2011/92/EU, as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an EIA. The electricity distribution activities do not fall under any of the annexes of the Directive. Based on available information at this stage, the environmental impacts of the project are expected to be minor and related mainly to noise, vibration, dust, and traffic disruption, and mostly temporary during the construction, which will be mitigated through appropriate site organisation and construction management. Subsurface risks are expected to be well controlled and managed based on the promoter's extensive experience in the area.

    As a public undertaking operating in the utility sector of an EEA member state, the Promoter is subject to public procurement and its procurement procedures need to be in line with the relevant applicable EU procurement legislation (Directives 2014/23/EU, 2014/25/EU, where applicable, as well as Directive 92/13/EEC), as transposed in the national legislation, with publication of the tender and award notices in the Official Journal of the European Union, as and where required.

    Étapes
    À l'examen
    Approuvé
    Signé
    25 septembre 2025
    12 novembre 2025

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - REYKJAVIK SUSTAINABLE ENERGY INVESTMENTS
    Date de publication
    27 Sep 2025
    Langue
    Sujet général
    Prêts
    Numéro du document
    246848119
    Thématique du document
    Information Environnementale
    Numéro du projet
    20240812
    Secteur(s)
    Régions
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes