    Signature(s)

    Montant
    226 293 572,44 €
    Pays
    Secteur(s)
    Suède : 226 293 572,44 €
    Industrie : 226 293 572,44 €
    Date(s) de signature
    18/12/2024 : 226 293 572,44 €

    Fiche récapitulative

    Date de publication
    27 mai 2024
    Statut
    Référence
    Signé | 18/12/2024
    20230412
    Nom du projet
    Promoteur – Intermédiaire financier
    MALMOE ENERGY EFFICIENT HOUSING
    MALMOE STAD
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    SEK 2600 million (EUR 226 million)
    SEK 3893 million (EUR 338 million)
    Lieu
    Secteur(s)
    Description
    Objectifs

    The project will finance the construction of approximately 2,370 new apartments for rent in the City of Malmoe (Southern Sweden).

    The aim is to support the construction of new housing units for rent, to be built using improved Energy Efficiency standards, performing at least 10% better than the Nearly-Zero Energy Building (NZEB) standard set by the current Swedish regulation.

    Additionnalité et impact

    The operation consists of an investment loan to finance the construction of highly energy efficient buildings located in the Malmoe metropolitan area. The operation supports the EU's and Bank's priority in the energy sector, the EIB's climate action objectives and will contribute to the achievement of Sweden's National Energy and Climate Plan.


    The operation meets an existing demand for highly energy efficient housing in Malmoe, a market characterised by constraints in housing supply and rapidly growing real estate and rental prices. Thermal comfort in the dwellings is ensured while households energy costs/consumption is kept to minimal levels. The risk of energy poverty, which has been accentuated with the recent increases in energy prices due to the Ukrainian conflict is therefore minimised.


    The Promoter is deemed to be capable of implementing the operation considering its overall experience. The operation is expected to be both financially and economically viable, with a good economic rate of return (ERR) and positive social broader benefit.


    The EIB is a provider of long-term loans with long draw-down availability periods that match the continuous funding needs of the City and its subsidiary companies to meet the capital expenditures needs to implement the City's ambitious development and expansion plans, while reaching its climate neutrality goals.


    Aspects environnementaux
    Passation des marchés

    The project will generate positive environmental benefits, by reducing energy consumption, greenhouse gas (GHG) emissions, as well as individual energy expenses compared to the baseline scenario. At construction stage, the project implementation may lead to increased noise and vibration level and may affect the air quality. Adequate mitigation measures will be implemented together with the enforcement of best practices. The project impacts at construction stage will be reversible and temporary at a level that are deemed acceptable. The project will be in compliance with the revised Energy Performance of Buildings Directive EU/2024/1275) amending Directives 2018/844/EU and 2010/31/EU, as well as with Directive 2018/2002/EU amending Directive 2012/27/EU on energy efficiency. The project will be in compliance with the EU Directive (2018/844/EU) amending the 2010 Energy Performance of Buildings Directive (Directive 2010/31/EU) and Directive 2018/2002/EU amending Directive 2012/27/EU on energy efficiency. The promoter's environmental management capacity to properly apply the relevant EU Directives will be verified during appraisal, particularly with regard to EU EIA Directive 2011/92/EU amended by 2014/52/EU, EU SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC. Some of the projects, namely construction of new buildings, may fall under Annex I or Annex II of the Directive EIA Directive 2011/92/EU amended by 2014/52/EU. The project will induce employment during implementation. The project will be appraised and monitored in line with the Bank's policies.

    The promoter has to ensure that contracts for implementation of the project have been/will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Étapes
    À l'examen
    Approuvé
    Signé
    17 juillet 2024
    18 décembre 2024

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - MALMOE ENERGY EFFICIENT HOUSING
    Date de publication
    18 Jul 2024
    Langue
    Sujet général
    Prêts
    Numéro du document
    190753845
    Thématique du document
    Information Environnementale
    Numéro du projet
    20230412
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes