    Signature(s)

    Montant
    90 000 000 €
    Pays
    Secteur(s)
    Pays-Bas : 90 000 000 €
    Transports : 90 000 000 €
    Date(s) de signature
    11/03/2026 : 90 000 000 €

    Fiche récapitulative

    Date de publication
    11 avril 2025
    Statut
    Référence
    Signé | 11/03/2026
    20230181
    Nom du projet
    Promoteur – Intermédiaire financier
    PORT OF ROTTERDAM SHORE POWER
    HAVENBEDRIJF ROTTERDAM NV,ROTTERDAM SHORE POWER BV
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 90 million
    EUR 284 million
    Lieu
    Secteur(s)
    Description
    Objectifs

    The project concerns investments in onshore electric power supply (OPS) equipment for vessels that berth at the main deep sea container terminals in Port of Rotterdam's Maasvlakte II, in particular at the APMT Maasvlakte II, ECT Delta South and ECT Euromax terminals. The investments will include the required grid connections, equipment, civil works, cabling works and connection systems.

    The project will allow vessels that berth at the terminals to connect to OPS, turn of the auxiliary engines and save fuel. The investments form an integral part of the Port's ambitions to reduce greenhouse gas and polluting emissions.

    Additionnalité et impact

    The Project covers investments into the electrification of the Port of Rotterdam, enabling the use of shore power for vessels while at berth. By avoiding the combustion of fossil fuels by vessels at berth, the Project has a significant positive impact on local pollution and noise levels in the port and in the wider port region and contributes to reducing the overall carbon emissions of maritime transport. The investments form an integral part of the Port's ambitions to improve its carbon footprint.

    EIB's contribution to the Project is rated as very good, providing customized terms (such as flexible drawdowns or a grace period longer than market standard) and aiding greater diversification and stability of the Borrower's financing. Further its contribution is signalling positive market effects, ensuring the possibility to apply for AFIF subsidies, and offering annual project monitoring.

    The proposed EIB loan, in combination with possible AFIF grants, enhances the financial feasibility of the investments and thereby contributes to the deployment of shore power and realisation of climate impact.

    Aspects environnementaux
    Passation des marchés

    The works included in the project do not fall under Annex I or II or the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU. Where and if applicable and based on a risk-based approach as defined in the EIB Group Environmental and Social Policy, the requirements of the EIA Directive 2011/92/EU (as amended by Directive 2014/52/EU), Birds Directive 2009/147/EC, Habitats Directive 92/43/EEC, Marine Strategy Framework Directive 2008/56/EC and Water Framework Directive 2000/60/EC will be checked during appraisal.

    The procurement regime applicable to the project depends on the promoter that is implementing different parts of the project. The main promoter, Rotterdam Shore Power BV, has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would require the promoter to apply those rules. The second promoter is Havenbedrijf Rotterdam N.V. (the Port of Rotterdam). The Bank will require this promoter to ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Étapes
    À l'examen
    Approuvé
    Signé
    27 mai 2025
    11 mars 2026

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - PORT OF ROTTERDAM SHORE POWER
    Date de publication
    3 Jun 2025
    Langue
    Sujet général
    Prêts
    Numéro du document
    241699696
    Thématique du document
    Information Environnementale
    Numéro du projet
    20230181
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes