Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Fiche récapitulative

Date de publication
17 mars 2025
Statut
Référence
À l'examen | 15/01/2025
20240873
Nom du projet
Promoteur – Intermédiaire financier
MADRID JUDICIAL INFRASTRUCTURE DEVELOPMENT
COMUNIDAD AUTONOMA DE MADRID
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 330 million
EUR 712 million
Lieu
Secteur(s)
Description
Objectifs

The project concerns the Region of Madrid New City of Justice. It will be an integrated urban development complex which will centralise in one single compound all existing judicial bodies and services that are under the responsibility of the Autonomous Region of Madrid (Comunidad Autónoma de Madrid).

The main objective of the project is to improve the quality of the public service of justice administration, pursuing the following objectives: - Centralise the judicial buildings in a single headquarters, solving the space deficit and the aging of some of the current buildings; - Generate reserve spaces, in order to cater for future extensions of the judicial administration in Madrid; - Improve the effectiveness and functioning of the judicial bodies, eliminating the reduction in the operability of the justice administration derived from the dispersion of the judicial offices; - Provide modern and functional infrastructures to the judicial bodies of Madrid, so legal officers can carry out their activities with the best possible quality; - Protect victims of crimes and the privacy of users, implementing spaces for specific attention and separation of circulations between detainees, officials and the public; - Creation of fully accessible judicial infrastructure, without architectural barriers and with the implementation of the necessary measures to achieve universal accessibility in judicial buildings, which allows effective access to justice for all persons with disabilities, under equal conditions as the rest of the users of this essential public service; - Optimise resources by reducing the costs associated with the lease of the buildings, the maintenance and upkeep of the facilities, as well as the costs associated with common services, through the configuration of a single compound that enables the achievement of efficiency gains by managing optimised lifecycle costs of a single centralised infrastructure; - Contribute to achieving the objectives of budgetary stability or financial sustainability, promoting a long-term reduction in costs derived from the operational functioning and efficiency of the service.

Aspects environnementaux
Passation des marchés

The Project is part of the urban development plan named "UNP.04.01 Ciudad Aeroportuaria y Parque de Valdebebas" (CAPV) for which a Strategic Environmental Assessment (SEA) has been performed in compliance with the EU SEA Directive 2001/142. Given the urban nature of the Project, the competent authority concluded that the Project does not have a significant effect on any conservation site in accordance with the Habitats (92/43/EEC) and Birds (79/409/EEC) Directives. Both, the resolution and the SEA report have been duly published in the local authority portal. The requirements of the applicable environmental legislation (mainly EIA Directive 2011/92/EU as amended by Directive 2014/52/EU) will be verified at appraisal.

The Bank will require the Promoter to ensure that contracts for implementation of the Project have been tendered in accordance with the applicable EU procurement legislation, for contracts above the threshold 2014/24/EU as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. Both, the tenders and subsequent awards of the contracts were published in the CAM's portal and the EU official journal, in conformity with public procurement rules.

Milestone
À l'examen
Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes