16 mai 2024
Référence
20230692
Nom du projet
Promoteur – Intermédiaire financier
DJERDAP II HPP REHABILITATION - FIRST PHASE
JSC ELEKTROPRIVREDA SRBIJE BELGRADE
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 90 million
EUR 90 million
Lieu
Secteur(s)
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Description
Objectifs

An allocation of EPS Green Financing framework loan (2022-0716) to finance the rehabilitation of three hydropower units and related auxiliary and electrical systems by 2030. The powerplant is located inside Iron Gate II dam on the Serbian side of the Danube River.

The operation is an allocation of the framework loan EPS Green Financing (EIB/20220716) which finances promoter's key green investments in the electricity sector for the period 2024-2030 with a view to increase ultimately the national share of renewables to the target set by 2030. The operation fits into the Promoter's "Go Green Strategy 2022-2035" and supports Serbia's green transition by contributing to the modernisation of the existing portfolio of hydro power plants. The Project allocation aims at extending the useful life of three units at Djerdap 2 HPP by up to 30 years and increase their annual electricity generation, installed capacity power from 27 MW up to 32 MW and provide additional flexibility to the Serbian electricity transmission network by allowing more renewable energy sources to be connected.

Aspects environnementaux
Passation des marchés

Serbian EIA procedure is regulated by the Law on Environmental Impact Assessment aligned with Environmental Impact Assessment (EIA) Directive 2014/52/EU, amending the EIA Directive 2011/92/EU. The national competent authority for the issuance of Decisions regarding environmental impact assessment is the Serbian Ministry of Environmental Protection. The EIA and public consultation of the Djerdap 2 hydropower rehabilitation programme was carried out successfully and corresponding environmental consent was issued by the Ministry in 2023. The Bank has assessed the social aspects of the project and found them in line with its Environmental and Social Sustainability Framework. Based on information received, the rehabilitation works and outcomes do not entail substantial adverse environmental or social impacts, with no resettlement. Aside from upgrading the power units to modern standards, one of the positive environmental impacts at operational stage is the replacement of the old chemical system for demineralized water preparation, which currently uses HCl and NaOH, with a new one based on reverse osmosis (green technology). Danube river HPPs (Djerdap 1 and 2 HPPs) are included in the River Basin Management Plan for the Danube River Basin District (DRBMP) issued by the International Commission for the Protection of the Danube River. Exploitation of Djerdap 1 and 2 HPPs is coordinated with the Romanian side, as Hidroelectrica (the Romanian hydro utility) is the owner of the other half of each plant. Cooperation with Romania is based on mutual agreements, and for all activities a Joint Commission with participants from both sides takes decisions regarding river basin management.

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules. The promoter Elektroprivreda Srbije (EPS) is a state-owned electric utility company. Public procurement procedures as set in the Bank's Guide to Procurement will apply.

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Projets associés
Projet apparenté
Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes