Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    1 900 000 000 €
    Pays
    Secteur(s)
    Italie : 1 900 000 000 €
    Énergie : 1 900 000 000 €
    Date(s) de signature
    30/03/2023 : 450 000 000 €
    30/03/2023 : 450 000 000 €
    8/11/2022 : 500 000 000 €
    7/02/2024 : 500 000 000 €
    Lien vers la source
    Fiche technique

    Fiche récapitulative

    Date de publication
    14 novembre 2022
    Statut
    Référence
    Signé | 08/11/2022
    20220162
    Nom du projet
    Promoteur – Intermédiaire financier
    TYRRHENIAN LINK
    TERNA - RETE ELETTRICA NAZIONALE SPA
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 1900 million
    EUR 3800 million
    Lieu
    Secteur(s)
    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    Description
    Objectifs

    The investment consists of an undersea high-voltage direct 950 km long current cable, connecting the Italian peninsula with Sicily (East section) and connecting Sicily with Sardinia (West section). The East section (Campania to Sicily) will have an installed capacity of 1000 MW (500 MWx2) and an approx. length of 480 km. The West section (Sicily to Sardinia) will have a total capacity of 1000 MW (500 MWx2) and an approx. length of 470 km. The investment will include associated works such as terrestrial underground cables and relevant connections.

    The Tyrrhenian Link will ensure electricity transmission between Italian mainland and the two islands of Sicily and Sardinia. The result will be an enhanced stability of the electrical system of the two islands and allow a more flexible integration of the renewable energy sources, necessary to fulfil the objective of phasing-out of coal power plants according the targets established by the Integrated National Energy and Climate Plan (INECP). Such plan foresee that, in 2030, renewables will cater for more than half of gross electricity consumption 55.4% with a complete phase-out of coal by 2025 that represent 8 GW of reduced generation capacity, of which 1 GW is located in Sardinia.

    Additionality and Impact

    The Project contributes to addressing multiple market failures, with significant impacts and net economic benefits for Italy and for the regions concerned, which are "Cohesion Regions".

    Thanks to the Project, the Country can progress towards its energy and climate plans faster and achieve a more cost-effective decarbonisation and energy transition. The high quality of the results of the Project is underpinned by significant experience and competence of the Promoter with the development and operation of this type of infrastructure.

    The support of the Bank, which is urgent and time-sensitive, contributes to the acceleration of the Project's implementation, by lowering the associated cost of funding and offering a tenor longer than those usually available in the market. The EIB commitment is expected to contribute to crowding-in other financers, as it would send a strong signal about the long-term soundness of the Project and credit worthiness of the Borrower.

    The value added provided by the EIB is even more tangible under the current market instability and turmoil generated by the pandemic and the Russia-Ukraine conflict, considering also the magnitude of the Project.

    Aspects environnementaux
    Passation des marchés

    Given its technical characteristics, the project does not fall under either Annex I or Annex II of the Environmental Impact assessment (EIA) Directive and, according to Italian law, will not be subject to a mandatory EIA. The Tyrrhenian Link will run across coastal and marine areas and an "Appropriate Assessment" on the possible impacts to the marine environment through habitat damage or loss, noise, chemical pollution, heat and electromagnetic field emissions was completed for the East Section and is being carried out for the West Section of the cable. The Environmental and Social due-diligence will focus on the review of the assessments carried out for the project under the current authorization framework, which refers to national and European contest (e.g. Habitats and Water Framework Directives and others), and the associated feedbacks from competent authorities.

    The promoter has to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, 2014/25/EU and with the Italian Public Procurement Act (D.lgs. 50/16).

    Lien vers la source
    Fiche récapitulative

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - TYRRHENIAN LINK
    Date de publication
    13 déc. 2022
    Langue
    Sujet général
    Prêts
    Numéro du document
    155550423
    Thématique du document
    Information Environnementale
    Numéro du projet
    20220162
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes