Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

Signature(s)

Amount
€ 120,000,000
Countries
Sector(s)
Italy : € 120,000,000
Energy : € 32,400,000
Solid waste : € 87,600,000
Signature date(s)
29/07/2019 : € 32,400,000
29/07/2019 : € 87,600,000

Summary sheet

Release date
20 May 2019
Status
Reference
Signed | 29/07/2019
20190156
Project name
Promoter - financial intermediary
IREN CLIMATE ACTION & CIRCULAR ECONOMY LOAN
IREN SPA
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 120 million
EUR 210 million
Location
Sector(s)
  • Energy - Electricity, gas, steam and air conditioning supply
  • Solid waste - Water supply; sewerage, waste management and remediation activities
Description
Objectives

The project consists of the financing of the promoter's 2018-2022 climate action and circular investments in the solid waste and hydro-electric sectors.

The operation is structured as a programme of investments. The waste sector investments will be carried out in the main service area in the Liguria, Piedmont and Reggio Emilia regions, while the hydroelectric investments focus on 16 sites located in four different areas/valleys (3 in Piedmont, 1 in Campania). The project comprises the following waste sector investments: i) Two anaerobic digestion plants for bio-waste with a total capacity of 175 000 t/yr, ii) one waste wood to pallets production plant with a capacity to process about 110,000 tonnes per year of waste wood and iii) the purchase of new electric waste collection and other vehicles. The hydro-electric investments comprise about 16 plants in four rivers with i) the rehabilitation of existing hydro power plants, ii) the increase of operational efficiency, safety and reliability of existing units and iii) the construction of 3 new mini-hydro power plants.

Environmental aspects
Procurement

The three waste facilities are expected to fall under Annex 2 of the Environmental Impact Assessment (EIA) directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU), and EIAs are required for the two digestion plants while the screening decision has not yet been received for the waste wood to pallets plant. None of the hydro-electric components are expected to require EIA. Compliance with the Habitats directive (92/43/EEC), Birds Directive (79/409/EEC), the Industrial Emissions Directive 2010/75/EU, and the Water Framework Directive (WFD) 2000/60/EC may also be required, where relevant. This will be verified during the appraisal.

The Bank will require the promoter to ensure that contracts for the implementation of the project have been or will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/23/EU / 2014/24/EU, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

Comments

n/a

Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Data Sheet (ESDS) - IREN CLIMATE ACTION & CIRCULAR ECONOMY LOAN
Publication Date
24 Jul 2019
Document language
Main Topic
Lending
Document Number
92602219
Document Focus
Environmental Information
Project Number
20190156
Sector(s)
Regions
Countries
Publicly available
Download now

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

Related publications