Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20080255
    Release date: 8 August 2008

    Promoter – Financial Intermediary

    City of Poznan

    Location

    Description

    The project consists of 6 major urban road schemes included in the Multi-Annual Investment Programme of the City.

    Objectives

    The project is expected to provide a higher quality standard of urban roads within the City, improving the overall network capacity and enhancing road safety, at the same time as reducing road congestion and its negative impacts on both society and environment.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    PLN 180.00 million. (EUR 53.33 million)

    Total cost (Approximate amount)

    PLN 600.00 million. (EUR 177.78 million)

    Environmental aspects

    Poland, as a Member State, has to comply with EU Directives (85/337/EC as amended and 2001/42/EC). Compliance with the requirements of the EU SEA Directive 2001/42/EC will be analysed during the appraisal. Moreover, the Bank will require compliance with the EU EIA Directive 85/337/EEC as amended by Directives 97/11/EC and 2003/35/EC, for every single scheme included in the project. Finally, even if the project concerns a consolidated urban environment and is not expected to affect Natura 2000 sites, compliance with the EU Habitats Directive 92/43/EEC and EU Birds Directive 79/409/EEC will be required by the Bank.

    Procurement

    EU Directives (2004/18/EC and 2004/17/EC) have been transposed into the national Polish legislation. Tenders will be organised in compliance with EU requirements, with publication of tender notices in the EU Official Journal for projects above thresholds. Application of EU procedures by the Polish authorities for the tender of services, supplies and civil works will be reviewed by the Bank’s services during appraisal.

    Status

    Signed - 15/12/2008

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Poland Transport