Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20070437
    Release date: 20 May 2008

    Promoter – Financial Intermediary

    Enerjisa Enerji Uretim A.S.

     

    Location

    Description

    The construction and operation of several small and medium size Hydro Electric Power Plants with an expected installed capacity of more than 900 MW. The plants are either run of river or they have reservoir’s smaller than 15 square kilometres.

    Objectives

    Support the development of renewable energy resources in Turkey and further develop the country’s hydro power potential.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to EUR 135 million

    Total cost (Approximate amount)

    Estimated at EUR 700 million

    Environmental aspects

    If the project were located in the EU, it would fall under Annex II of the EIA Directive (85/337/EEC) as amended, requiring the competent national authority to determine the need for an EIA. In this case, as the installed capacity for each plant – except for two small run of river developments – is likely to exceed 50MW, they will require an EIA under national legislation.

    Procurement

    Publication in the OJEU will be undertaken for items financed by the EIB, in line with the EIB Guide to Procurement.

    Status

    Signed - 11/07/2008

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Turkey Energy