Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20060385
    Release date: 21 December 2006

    Promoter – Financial Intermediary

    Public Enterprise "Roads of Serbia"

    Location

    Description

    The project concerns the construction of 47 km of bypass roads located in the West and South of the City of Belgrade. It includes the following works:

    • Section A: construction of a 2 x 2 lane motorway link between Batanica and Dobanovci (Roads E70 - E75; 10 km);
    • Section B: upgrading to 2 x 2 lane motorway standard of the existing road between Dobanovci and Ostruznica (16.8 km), including the construction of an additional bridge crossing the Sava river, and construction or finishing of the section between Ostruznica and Bubanj Potok (20.5 km), including 4 tunnels.

    Objectives

    The project will allow a new alternative for transit traffic through Belgrade and will relieve traffic congestion within the city, especially on the Gazela Bridge and the urban sections of the E-70 and E75 highways.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to EUR 180 million.

    Total cost (Approximate amount)

    Up to EUR 530 million.

    Environmental aspects

    Should the project be in the EU, it would be subject to the requirements of the EU Directive 97/11 Annex I, i.e. full environmental impact assessment with public consultation. An EIA covering both sections included in the project has been prepared by an international consultant and was finalized in March 2005.

    The road corridor generally lies across agricultural land, away from residential areas. The topography and the geology of the soils of the section B are rather difficult.

    Environmentally sensitive areas have been identified along the route. However, no biodiversity areas protected under national or international legislation have been identified.

    Procurement

    Procurement of works will be on the basis of open international competitive bidding in line with EIB's Guide to Procurement. It is expected that an appropriately staffed Project Implementation Unit (PIU) with experienced Technical Assistance will be responsible for assisting in the management of the procurement process.

    National competitive bidding will be applied for the procurement of the Design studies.

    The procurement of the Supervision and Management consultants will be on the basis of international competitive bidding according to EU-regulations.

    Status

    Signed - 19/10/2007

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Serbia Transport