    Reference: 20050254
    Release date: 3 April 2006

    Promoter – Financial Intermediary

    Federal democratic Republic of Ethiopia
    Ministry of Water Resources

    Location

    Description

    The project is focused on rehabilitating and extending the water supply and sanitation services in 15 medium-sized towns across Ethiopia. Project definition includes new water sources (construction of 52 boreholes, 1 spring and 1 water surface intakes), the extension of the distribution network (some 215 km of new distribution pipes and mains), the increase of storage capacity (30 new reservoirs representing additional 15 100 m³ of water) and the construction of 182 new public fountains. It also includes technical assistance and a special small loan/grant facility to facilitate universal household access to water.

    The project is a follow-up of a World Bank funded program that has set up individual measures to be implemented for each town based on specific feasibility studies.

    Objectives

    The project has a clear focus on providing water and limited basic sanitary services to the poor. By significantly augmenting the population (some 500 000 people) with access to drinking water, the project will have a positive impact on health by reducing the risk of waterborne diseases and will contribute to poverty alleviation. The co-financing of the project by the EU Water Facility and the EIB reflects the commitment of the EU institutions in favour of the Millenium Development Goals (2000 -2015) through additional support to sector-related development programmes.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to EUR 16.5 million

    Total cost (Approximate amount)

    up to EUR 36.2 million

    Environmental aspects

    Given the nature, scale and location of sub-projects, the project does not pose significant risk from an environmental point of view. An environmental Impact Statement (EIS) has been included in the set of feasibility studies for each town, proposing appropriate mitigation measures when necessary. International environmental standards were applied for the EIS.

    The project implements the user-pay principle leading to water savings.

    Procurement

    According to the rules of the EU Water Facility for actions to be implemented through an ACP state, all contracts will be procured according to EDF rules. A special procurement advisor together with the PIU will supervise all tenders and the Bank will retain no-objection rights to all national and international tenders.

    Status

    Signed - 19/12/2006

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Ethiopia Water, sewerage