    Reference: 20020377
    Release date: 26 November 2004

    Promoter – Financial Intermediary

    Société Nationale d’Electricité du Burkina Faso (SONABEL)

    Location

    Description

    The project consists of the 338 km electrical interconnection between Bobo-Dioulasso and Ouagadougou, construction of transformer stations, upgrading of the network in Ouagadougou and electrification of provincial towns located along the route. Imported energy will thus be transmitted to the country's main consuming centre, Ougadougou.

    Objectives

    The project represents the logical continuation of the electrical interconnection between the Ivory Coast (Ferkessédougou) and Burkina Faso (Bobo-Dioulasso), for which the EIB has already provided finance. Imported energy will thus be transported to the country's main consumer centre, Ougadougou. For a country such as Burkina Faso, this is the most economic solution for coping with growing energy demand, allowing a considerable reduction in state subsidies on the price of fuel for thermal energy. Moreover, this project will support the privatisation process in this sector.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 15.25 million.

    Total cost (Approximate amount)

    EUR 77.1 million.

    Environmental aspects

    Environmental aspects mainly concern the visual impact and destruction of forest. About 157 ha of forest will be cut and an equivalent area reforested. In addition, up to 52 village houses will be moved. The owners will be compensated and resettled in the same villages. No nature conservation sites will be affected by the project. The Ministry of the Environment has approved the project and an Environmental and Social Management Plan has been prepared including a number of mitigating measures such as reforestation and compensation for the land owners.

    Procurement

    In general, international open tendering procedures are applied. Components earmarked for EIB financing are published in the EU Official Journal.

    Status

    Signed - 28/12/2004

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Burkina Faso Energy