Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20010432
    Release date: 21 February 2002

    Promoter – Financial Intermediary

    The Saarland

    Location

    Description

    The proposed project consists of small and medium sized works on the road network of Saarland, which is to a large extent an objective 2) area, and involves the realignment, strengthening, widening and up-grading of existing roads, as well as the construction of new roads and bridges.

    Objectives

    The investments aim at a reduction of overall transport costs, increased traffic safety and better labour mobility and will modernize the road network of Saarland.

    Comments

    Supporting and auxiliary transport activities.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to EUR 75 million

    Total cost (Approximate amount)

    Up to EUR 150 million

    Environmental aspects

    Strengthening, widening and upgrading of existing roads, which represent the main component of the project, are not expected to generate significant impacts on the environment as the works are usually confined within existing road boundaries. New road construction and substantial realignment are to follow the German Planfeststellungsverfahren (approval procedure), which incorporates the main components of EU Directive 97/11 EC (environmental impact assessment).

    Procurement

    Compliance with the EU Directive (93/37). Construction contracts with values above EUR 5m are published in the Official Journal of the European Communities. If the nature of the works shows that smaller contract values predominate, they are all published in the relevant German official journals.

    Status

    Signed - 15/11/2002

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Germany Transport