    Reference: 20000200
    Release date: 28 April 2003

    Promoter – Financial Intermediary

    SWAZILAND ELECTRICITY BOARD
    P.O. Box 258
    Mbabane
    Swaziland

    Location

    Description

    The purpose of the project is to utilise the hydroelectric potential from a large recently constructed irrigation dam, thereby providing additional domestic electricity production capacity, partly during peak hours, to the power system. The project is located on the Komati River, near the town of Pigg’s Peak in northwestern Swaziland.

    Objectives

    To reduce Swaziland’s dependence on power imports, as well as assisting in developing renewable energy resources.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to EUR 7m

    Environmental aspects

    A Comprehensive Mitigation Plan was established and implemented for the construction of the dam itself, which included public consultation, resettlement and substantial compensation to the people affected. The incremental environmental impact of the hydropower project is considered very limited, with any necessary mitigation measures being taken. Compliance Certificates will be issued by the Swaziland Environment Authority once these measures are implemented.

    Procurement

    The project will be subject to international bidding published in the Official Journal of the EC in accordance with the Bank’s rules.

    Status

    Signed - 18/06/2003

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Swaziland Energy