30 100 000 €
Pays
Secteur(s)
Gambie : 30 100 000 €
Eau, assainissement : 30 100 000 €
Date(s) de signature
23/12/2025 : 8 000 000 €
23/12/2025 : 22 100 000 €
(*) Y compris des subventions à l'investissement de 8 000 000 € fourni par PUBLIC ENTITY(IES)
Lien vers la source

Fiche récapitulative

Date de publication
7 octobre 2025
Statut
Référence
Signé | 23/12/2025
20240649
Nom du projet
Promoteur – Intermédiaire financier
SUSTAINABLE WATER SUPPLY GREATER BANJUL GAMBIA
NATIONAL WATER AND ELECTRICITY COMPANY LTD
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 30 million
EUR 59 million
Lieu
Secteur(s)
  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
Description
Objectifs

The Water Supply Project in the Greater Banjul Area (WASIB) will finance critical infrastructure to provide safely managed drinking water services in the Greater Banjul Area, The Gambia. WASIB addresses several challenges in the area, including ageing water supply facilities, high levels of non-revenue water, intermittent water supply, and depleting groundwater resources. The project covers both drilling and emergency works necessary to maintain and improve service continuity for about 560,000 people (approximately 25% of the country's population). It also includes water production and treatment, as well as water transmission, storage, and distribution for approximately 300,000 additional new beneficiaries.

The aim is to support the Gambian water utility (NAWEC) in strengthening its capacity to operate and maintain water supply systems, with the goal of improving drinking water services in the Greater Banjul Area.

Additionality and Impact

The project aims at increasing the availability and accessibility of safely managed drinking water services to target communities in the Greater Banjul Area (GBA) in The Gambia. By following an integrated approach, it includes the construction of new boreholes for water production, investments in water treatment, water transmission, water storage, and water distribution. The Project is in line with the Bank's Water Resilience Program and will contribute to the Bank's public policy goal "Sustainable Energy and Natural Resources (water, wastewater and flood protection). It will contribute to climate action through investments that aim at increasing the water and energy efficiency of the water supply system while increasing the resilience of the water systems to more climate change risks such as extreme weather events.


The project is in line the with The Gambia National Development Plan 2023-2027 as well as Priority 3 of the Multi-Annual Indicative Programme for The Gambia, "Human Development", as improving water and sanitation services directly support the country's broader human development goals by fostering a healthier population and sustainable urban growth. The projects also aligns with the EU's Global Gateway Strategy (Green transition / Biodiversity), aiming to ensure water security and improve livelihoods by 2030. The Project will contribute to mitigating market failures in the water supply sector by financing infrastructure which results in positive externalities in the form of avoided public health costs, environmental benefits from protection of surface water abstraction areas, and the benefits of enabling socio-economic development in the areas served by these infrastructures, including society-wide benefits from being better able to mitigate and adapt to the adverse impacts of climate change.


EIB loan offers extended tenor and grace period, and is blended with an investment grant from ACP TF/MS Compartment, thus offering favourable and highly concessional financing conditions to the borrower, the Republic of The Gambia.


Aspects environnementaux
Passation des marchés

The project will have a positive impact through: (i) increased access to safely managed drinking water services for the local population; (ii) reduction of greenhouse gas emissions through energy savings due to optimized, state-of-the-art water exploitation and water treatment processes; (iii) adaptation to climate change impacts by using a sustainable and more resilient water source in an area that is heavily impacted by climate change; and (iv) improved public health. In line with the EIB's Environmental & Social Standard (paragraph 7), the project components that are likely to have significant environmental, climate and/or social impacts shall be subject to an Environmental Impact Assessment (EIA) and/or Social Impact Assessment (ESIA) process.

The promoter will be required to implement the project in accordance with the Agence Française de Développement (AFD) procurement rules and procedures, and in compliance with the requirements and standards agreed between EIB and AFD for projects outside the EU under the Mutual Reliance Initiative (MRI), as foreseen in the EIB's Guide to Procurement. In particular, calls for international tenders will be published in the Official Journal of the EU and/or on the EIB's website in accordance with the EIB's Guide to Procurement.

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Milestone
À l'examen
Approuvé
Signé
10 décembre 2025
23 décembre 2025
Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Évaluation des incidences environnementales et sociales - SUSTAINABLE WATER SUPPLY GREATER BANJUL GAMBIA - Environmental and Social Impact Assessment Report
Date de publication
21 Oct 2025
Langue
Sujet général
Prêts
Numéro du document
252089849
Thématique du document
Information Environnementale
Numéro du projet
20240649
Secteur(s)
Pays
Disponible au public
Télécharger maintenant
Fiche technique sur les aspects sociaux et environnementaux - SUSTAINABLE WATER SUPPLY GREATER BANJUL GAMBIA
Date de publication
10 Dec 2025
Langue
Sujet général
Prêts
Numéro du document
253310627
Thématique du document
Information Environnementale
Numéro du projet
20240649
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes