Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

Unterzeichnung(en)

Betrag
527.141.953,48 €
Länder
Sektor(en)
Polen : 527.141.953,48 €
Energie : 527.141.953,48 €
Unterzeichnungsdatum
25/04/2025 : 527.141.953,48 €
Link zum projekt

Übersicht

Veröffentlichungsdatum
27 Mai 2024
Projektstatus
Referenz
Unterzeichnet | 25/04/2025
20230621
Projekttitel
Projektträger – Finanzintermediär
PGE REPOWEREU FRAMEWORK LOAN
PGE ENERGIA ODNAWIALNA SA
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
PLN 2250 million (EUR 523 million)
PLN 3474 million (EUR 808 million)
Ort
Sektor(en)
Beschreibung
Ziele

The framework loan will finance the construction and operation of solar photovoltaic (PV) power plants across Poland and modernisation of one pumped storage hydropower plant.

The aim is to finance part of the promoter's solar PV project pipeline as well as the modernisation of one of its existing pumped storage hydropower plants in Poland. The operation will contribute the achievement of the 2030 decarbonisation targets set out in the National Energy and Climate Plan (NECP) of Poland; it is therefore eligible under Article 309 point (c) common interest. A high proportion of the underlying projects are expected to be located in Less Developed Regions, thus are eligible under Article 309 point (a). The underlying projects are expected to be economically justified by generating clean and renewable electricity at a cost (on a levelised cost of energy basis) below the cost of fossil-fuel based alternatives in Poland.

Additionality and Impact

The project increases renewable energy generation capacity in Poland and contributes to national and EU 2030 climate objectives. This Framework Loan contributes to the Bank's lending priority objectives of Renewable Energy, on Climate Action, Environmental Sustainability and partially to Economic and Social Cohesion. The project produces electricity from low carbon sources (solar PV), addressing the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and air pollution compared to fossil-fuel generation. In addition, the Pumped Storage Hydro plant, improves flexibility of the market and increase the share of intermittent renewable energy generation that can be injected into the grid.

 

As the schemes are expected to rely, at least partially, on revenues from the market (the wholesale market and/or unsubsidized commercial Power Purchase Agreements), in a sector characterised by incomplete markets (limited forward/hedging, lack of scarcity and locational pricing), the operation improves market efficiency and competition.

 

The schemes are expected to be located mostly in EIB Cohesion Priority regions. At least 54% as per initial CAPEX estimate presented by the promoter for the Pumped Storage Hydro and for the PV pipeline is located in Less Developed Regions.

 

The Promoter appreciates the terms provided by the EIB. The long tenor of the EIB loan (18) is well in line with the economic life of the underlying electricity distribution assets and it is perfectly suited to finance investments with long payback period such as the Project implemented by PGE. The funding of similar maturities is not available on the Polish bond and loan market. Customised terms such as flexible drawdown over the long availability period are of value to the Promoter because of the multiannual Project's implementation period and PLN cash-flows. The EIB involvement will send a strong signalling effect to the commercial banks operating in Poland and other stakeholders that EIB is standing by to support the decarbonisation of the Polish energy sector.

Umweltaspekte
Auftragsvergabe

The solar PV schemes as well as rehabilitation works at the pumped storage hydro plant are expected to fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, requiring the competent authorities to determine whether an EIA is required. The EIB will assess the capacity and procedures of the promoter to ensure the schemes' compliance with the sector-relevant national and European environmental and biodiversity regulations. For large allocations, the authorization procedure and compliance with the relevant EU directives, specifically Habitats and Birds Directives (92/43/EEC and 2009/147/EC respectively), will be further assessed during the appraisal of the individual scheme, in particular the potential cumulative impacts assessment and the impacts on protected flora and fauna, including Natura 2000 sites. Given that China largely dominates the market of photovoltaic solar panels, and media reports about the risk of forced labour, the Bank will apply an enhanced due diligence on the topic, in line with the EIB's Environmental & Social Standards. The project is expected to contribute to Climate Action and Environmental Sustainability (CA&ES) objectives, in particular to climate change mitigation and pollution prevention and control.

The promoter has to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
In Prüfung
Genehmigt
Unterzeichnet
28 August 2024
25 April 2025
Projekte zum thema
Link zum projekt
Andere Links

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Dokumente

Formblatt ökologische und soziale Aspekte - PGE REPOWEREU FRAMEWORK LOAN
Datum der Veröffentlichung
30 Aug 2024
Sprache
Bereich
Finanzierung
Nummer des Dokuments
188285609
Thema
Umweltinformationen
Projektnummer
20230621
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdeverfahren

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

Weitere Veröffentlichungen