    Signature(s)

    Amount
    € 120,000,000
    Countries
    Sector(s)
    Italy : € 120,000,000
    Energy : € 32,400,000
    Solid waste : € 87,600,000
    Signature date(s)
    29/07/2019 : € 32,400,000
    29/07/2019 : € 87,600,000

    Summary sheet

    Release date
    20 May 2019
    Status
    Reference
    Signed | 29/07/2019
    20190156
    Project name
    Promoter - financial intermediary
    IREN CLIMATE ACTION & CIRCULAR ECONOMY LOAN
    IREN SPA
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 120 million
    EUR 210 million
    Location
    Sector(s)
    • Energy - Electricity, gas, steam and air conditioning supply
    • Solid waste - Water supply; sewerage, waste management and remediation activities
    Description
    Objectives

    The project consists of the financing of the promoter's 2018-2022 climate action and circular investments in the solid waste and hydro-electric sectors.

    The operation is structured as a programme of investments. The waste sector investments will be carried out in the main service area in the Liguria, Piedmont and Reggio Emilia regions, while the hydroelectric investments focus on 16 sites located in four different areas/valleys (3 in Piedmont, 1 in Campania). The project comprises the following waste sector investments: i) Two anaerobic digestion plants for bio-waste with a total capacity of 175 000 t/yr, ii) one waste wood to pallets production plant with a capacity to process about 110,000 tonnes per year of waste wood and iii) the purchase of new electric waste collection and other vehicles. The hydro-electric investments comprise about 16 plants in four rivers with i) the rehabilitation of existing hydro power plants, ii) the increase of operational efficiency, safety and reliability of existing units and iii) the construction of 3 new mini-hydro power plants.

    Environmental aspects
    Procurement

    The three waste facilities are expected to fall under Annex 2 of the Environmental Impact Assessment (EIA) directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU), and EIAs are required for the two digestion plants while the screening decision has not yet been received for the waste wood to pallets plant. None of the hydro-electric components are expected to require EIA. Compliance with the Habitats directive (92/43/EEC), Birds Directive (79/409/EEC), the Industrial Emissions Directive 2010/75/EU, and the Water Framework Directive (WFD) 2000/60/EC may also be required, where relevant. This will be verified during the appraisal.

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been or will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/23/EU / 2014/24/EU, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

    Comments

    n/a

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - IREN CLIMATE ACTION & CIRCULAR ECONOMY LOAN
    Publication Date
    24 Jul 2019
    Document language
    Main Topic
    Lending
    Document Number
    92602219
    Document Focus
    Environmental Information
    Project Number
    20190156
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Completion Sheet (ESCS) - IREN CLIMATE ACTION & CIRCULAR ECONOMY LOAN
    Publication Date
    30 Dec 2025
    Document language
    Main Topic
    Lending
    Document Number
    255482463
    Document Focus
    Environmental Information
    Project Number
    20190156
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications