Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

Unterzeichnung(en)

Betrag
17.000.000 €
Länder
Sektor(en)
Tschechien : 1.020.000 €
Slowakei : 2.550.000 €
Polen : 13.430.000 €
Verkehr : 17.000.000 €
Unterzeichnungsdatum
22/10/2018 : 1.020.000 €
22/10/2018 : 2.550.000 €
22/10/2018 : 13.430.000 €
Link zum projekt
Andere Links

Übersicht

Veröffentlichungsdatum
22 Januar 2019
Projektstatus
Referenz
Unterzeichnet | 22/10/2018
20180075
Projekttitel
Projektträger – Finanzintermediär
GREENWAY EV CHARGING NETWORK (EDP)
GREENWAY INFRASTRUCTURE SRO
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 17 million
EUR 34 million
Ort
Sektor(en)
Beschreibung
Ziele

The aim of the operation is to co-finance under the Innovfin Energy Demonstration Projects ("EDP") facility the expansion of the current electric vehicles ("EV") fast charging network of GreenWay across several countries in Central and Eastern Europe. It will also support the deployment of its first Ultra Fast Charging stations and the pilot of an integrated battery energy storage system across Poland, Slovakia and other CEE countries.

The project consists of the installation of approx. 863 charging stations by 2020. The charging infrastructure will include 419 slow charging (ie. 3.7 kW - 22 kW) stations, as well as a roll out of 400 Fast Charging (ie. 22kW – 50 kW) stations and the first Ultra-Fast Charging (ie. 150 kW – 350 kW) network of 44 stations deployed across Poland, Slovakia and other CEE countries. The project also includes the demonstration of stations with Battery Assisted Charging System (BACHS). The project will contribute to push the transition towards lower carbon transport vehicles. The project is in line with EU Directive on Alternative Fuels 2014/94/EU, which has set out minimum requirements for the building-up of electric vehicles charging infrastructure.

Umweltaspekte
Auftragsvergabe

The project components consist of short connections to the distribution grid networks and the respective charging stations. They are expected to have limited environmental impact, which will typically be related to noise nuisance and disturbance during construction. After completion, no environmental impact is expected from the ordinary operation of the stations. No environmental impact assessment is required for the project, as it does not fall under either Annex I or Annex II of the EU EIA Directive. EV infrastructure in itself is not subject to environmental impact assessment processes under either Annex I or Annex II of the EIA Directive. However, the building of green field parking locations where the EV infrastructure is installed and/or connections to the grid may be screened in under Annex II. The Bank will require in those cases to be informed of the screening decision from Competent Authority. The project is expected to have a positive effect on the environment. The project will power electric vehicles with no emissions of pollutants and hence will contribute to meet air quality standards as set out by the European Union (EU) and the World Health Organization (WHO). The project will also contribute to reduce road transport noise pollution as EVs are also much quieter than conventional vehicles. Finally, the project will have a significant impact on CO2 emissions reduction that will result from the replacement of conventional cars operating on fossil fuels with electric cars powered by less carbon intensive electricity. No major social issues are envisaged.

The promoter has been assessed by the EIB as being a private company and hence not being subject to EU rules on public procurement or concessions.

Link zum projekt
Andere Links

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Photogallery

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdeverfahren

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

Weitere Veröffentlichungen