Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 25,000,000
    Countries
    Sector(s)
    Portugal : € 25,000,000
    Industry : € 25,000,000
    Signature date(s)
    22/03/2016 : € 25,000,000
    Link to source

    Summary sheet

    Release date
    7 May 2015
    Status
    Reference
    Signed | 22/03/2016
    20150061
    Project name
    Promoter - financial intermediary
    PORTUCEL CACIA MILL OPTMISATION
    PORTUCEL SA
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 25 million
    EUR 59 million
    Location
    Sector(s)
    Description
    Objectives

    The project is a modernisation and expansion of the existing Cacia (Aveiro) pulp mill to increase its efficiency and production from 287,000 to 353,000 tonnes per annum.

    The project involves modernising the existing Cacia (Aveiro) pulp mill, aiming to remove process bottlenecks that currently prevent the plant from reaching its full, permitted nominal production capacity of 1000 tonnes per day. The project will also upgrade the air emission abatement systems to fully align the plant with the specifications established in the new draft Best Available Techniques (BAT) reference document for the pulp and paper industry. It will increase the annual output of the plant from its current 287,000 to 353,000 tonnes per annum. Due to process efficiency gains power output will increase by 3.4 MW to 29 MW. The modernised mill will produce high quality fibre (pulp) and generate renewable electricity associated with the pulp production process.

    Environmental aspects
    Procurement

    The project falls under Annex II of Directive 2011/92/EU on environmental impact assessment (EIA) (modification of an industrial facility for the production of pulp). The existing plant, operational since 1953, has continuously undergone adaptations and modernisation cycles to incorporate best available technology. The latest environmental permit under the EIA and Integrated Pollution Prevention and Control (IPPC) Directives dates from 2009. The competent authorities concluded that the project did not add environmental load and did not exceed emission thresholds established in national environmental legislation for pulp and paper mills. Hence the project has been screened out. The IPPC permit from 2009 will be reconsidered by the competent authorities in line with the provisions of the Industrial Emissions Directive 2010/75/EU. The investment will be within the existing facilities and will thus have only negligible additional visual impact on the landscape. Because of the project's location at an existing industrial site, significant negative impact by the project on any site of nature conservation is considered unlikely. Due to the targeted investments in best available emission abatement technologies, the project will lead to reduced environmental impact in comparison to the existing plant. The targeted emission limits for the plant are in line with the latest draft BAT Reference Document. The Bank's Environmental Assessment Group (ENVAG) was consulted for review. The project will use wood sourced locally and from international wood markets under strict chain-of-custody systems and produced from forests managed under international recognised certification schemes. Details of the permitting procedures, potential impact on close-by nature conservation sites and sustainability and origin of the biomass will be further assessed during the appraisal.

    The project sponsor is a private company of industrial or commercial character, not operating in the utilities sector as its main economic purpose and not having any special or exclusive right, and is therefore not affected by EU directives on procurement. However, if after the project appraisal, the EIB were to conclude that the project is after all subject to EU public procurement legislation (i.e. Directive 2004/17/EC), then the Bank would require the promoter to ensure that contracts for the implementation of the project have been/will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC and Directive 92/13/EEC), with publication of tender notices in the EU Official Journal, as and where required.

    Link to source

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - PORTUCEL CACIA MILL OPTIMISATION
    Publication Date
    2 Jul 2015
    Document language
    Main Topic
    Lending
    Document Number
    60106391
    Document Focus
    Environmental Information
    Project Number
    20150061
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Completion Sheet (ESCS) - PORTUCEL CACIA MILL OPTIMISATION
    Publication Date
    13 Nov 2018
    Document language
    Main Topic
    Lending
    Document Number
    81639209
    Document Focus
    Environmental Information
    Project Number
    20150061
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    News & Stories

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications