    Summary sheet

    Release date
    3 October 2011
    Status
    Reference
    Under appraisal | 03/10/2011
    20100637
    Project name
    Promoter - financial intermediary
    Sopron-Szentgotthard Railway

    Republic of Hungary represented by the National Development Agency

    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 15.20 million
    EUR 98 million
    Location
    Sector(s)
    Description
    Objectives

    The project consists of the modernisation of the existing single track railway line between Sopron-Szombathely-Szentgotthard, 116 km, including installation of new ETCS level 2 signalling system and electrification from Szombathely to Szentgotthard. Purchase of four electric multiple units for regional passenger traffic is also foreseen.

    The project aims at increasing railway share in traffic, improving safety and reducing emissions by (i) reducing travel time, (ii) increasing line capacity, (iii) electrification, (iv) improving traffic control, (v) using active and passive noise protection, (vi) installing platforms, lighting and audio visual equipment at stations and stops and (vii) improving or eliminating level crossings.

    Environmental aspects
    Procurement

    The project falls under Annex II of the EIA Directive and was screened out by the Competent Authorities on the basis of the preliminary environmental impact studies carried out. The Competent Authorities also confirmed that the project will not have any significant impact on declared Natura 2000 sites. Thanks to the electrification of the line, the project will reduce negative environmental externalities due to rail service operation, significantly decreasing associated levels of noise and emission of pollutants. Furthermore, a number of active and passive noise protection measures shall be adopted to minimise potential negative impacts. Compliance with environmental legislations will be verified during appraisal.

    The project implementation is managed by the GYSEV Zrt. which has obtained in 2006 a 40 year concession for line operation. GYSEV Zrt. Is an Austrian-Hungarian joint venture. The owner of the line is the Hungarian State Treasury represented by the Hungarian State Property Operator Ltd. The company is obliged to comply with the European and National Public Procurement legislation. The procurement process will be verified during appraisal.

    Comments

    Under Framework Loan

    Link to source

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - SOPRON-SZENTGOTTHARD RAILWAY
    Publication Date
    10 Jun 2016
    Document language
    Main Topic
    Lending
    Document Number
    66974828
    Document Focus
    Environmental Information
    Project Number
    20100637
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Completion Sheet (ESCS) - SOPRON-SZENTGOTTHARD RAILWAY
    Publication Date
    9 Mar 2017
    Document language
    Main Topic
    Lending
    Document Number
    71675370
    Document Focus
    Environmental Information
    Project Number
    20100637
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Other links

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications