12 October 2010
Status
Reference
Under appraisal | 12/10/2010
20080466
Project name
Promoter - financial intermediary
Corridor IV Railway Improvements-1

Ministry of Transport of the Czech Republic;
Managing Authority of the Operational Programme of Transport in the Czech Republic

Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
Up to CZK 2 254 million.
CZK 7 513.5 million.
Location
Sector(s)
Description
Objectives

The project consists of the modernisation of two railway sections located on Corridor IV south of Prague. The first scheme is a 24 km long double track electrified line from Benesov u Prahy to Strancice. The second scheme is a 12 km long single track electrified line from Doubi to Tabor.

The project corresponds to an optimisation of capacity and performance of the existing infrastructure both for passengers and freight traffic. It also encompasses an improvement of network safety and reliability. The project raises the infrastructure level to EU standards and is a step towards the gradual achievement of interoperability of networks.

Environmental aspects
Procurement

The project falls under Annex II of Directive 97/11/EC as amended by Directive 2003/35/EC and an EIA has been carried out. All procedural rules, transposed into Law of the Czech Republic (Act 100/2001 Coll.), have been respected. The project crosses two NATURA 2000 sites and the competent authority has confirmed that the project has no significant impacts on the sites.

EU procurement directives (2004/17/EC, 2004/18/EC) have been transposed into Czech legislation by the Act No. 137/2006 Coll.

The contract notices for the international open tender have been published in the Official Journal of the European Communities (OJEC). The main contracts have been published in the OJEC under the reference number 2006/S 113 0120888 on 16/06/2006 for scheme 1 and S 235 0251095 on 9/12/2006 for scheme 2.

Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications