€ 16,500,000
Countries
Sector(s)
Ethiopia : € 16,500,000
Water, sewerage : € 16,500,000
Signature date(s)
19/12/2006 : € 16,500,000
Link to source
Other links

Summary sheet

Release date
3 April 2006
Status
Reference
Signed | 19/12/2006
20050254
Project name
Promoter - financial intermediary
Small Town water & Sanitation Programme

Federal democratic Republic of Ethiopia
Ministry of Water Resources

Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
Up to EUR 16.5 million
up to EUR 36.2 million
Location
Sector(s)
Description
Objectives

The project is focused on rehabilitating and extending the water supply and sanitation services in 15 medium-sized towns across Ethiopia. Project definition includes new water sources (construction of 52 boreholes, 1 spring and 1 water surface intakes), the extension of the distribution network (some 215 km of new distribution pipes and mains), the increase of storage capacity (30 new reservoirs representing additional 15 100 m³ of water) and the construction of 182 new public fountains. It also includes technical assistance and a special small loan/grant facility to facilitate universal household access to water.

The project is a follow-up of a World Bank funded program that has set up individual measures to be implemented for each town based on specific feasibility studies.

The project has a clear focus on providing water and limited basic sanitary services to the poor. By significantly augmenting the population (some 500 000 people) with access to drinking water, the project will have a positive impact on health by reducing the risk of waterborne diseases and will contribute to poverty alleviation. The co-financing of the project by the EU Water Facility and the EIB reflects the commitment of the EU institutions in favour of the Millenium Development Goals (2000 -2015) through additional support to sector-related development programmes.

Environmental aspects
Procurement

Given the nature, scale and location of sub-projects, the project does not pose significant risk from an environmental point of view. An environmental Impact Statement (EIS) has been included in the set of feasibility studies for each town, proposing appropriate mitigation measures when necessary. International environmental standards were applied for the EIS.

The project implements the user-pay principle leading to water savings.

According to the rules of the EU Water Facility for actions to be implemented through an ACP state, all contracts will be procured according to EDF rules. A special procurement advisor together with the PIU will supervise all tenders and the Bank will retain no-objection rights to all national and international tenders.

Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications