    Referenz: 20210398
    Veröffentlichungsdatum: 15 Juni 2021

    Projektträger – zwischengeschaltetes Finanzinstitut

    MAVIR MAGYAR VILLAMOSENERGIA-IPARI ATVITELI RENDSZERIRANYITO ZRT

    Ort

    Beschreibung

    The project comprises the extension and reinforcement of the electricity transmission network in Hungary, over the period 2021-2025.

    Ziele

    The project is expected to support the efficient operation of the electricity transmission network in Hungary, to enable the Promoter to maintain the reliability and quality of the electricity supply, and to contribute to the integration of renewable energy sources (RES) generation.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 200 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 292 million

    Umweltaspekte

    The project comprises electricity transmission schemes (overhead lines, new substations and works in existing substations), some of which will fall under Annex I of the Environmental Impact Assessment (EIA) Directive and will have to undergo an obligatory environmental impact assessment, while most of the remaining schemes will fall under Annex II, thus requiring the competent national authority to determine the need for an EIA. The main impacts that can typically be expected for a project of this nature relate to visual impact, vegetation clearance, electromagnetic fields, noise nuisance, impact on flying vertebrates and disturbance during construction.

    Auftragsvergabe

    The Bank will require that the Promoter ensures that contracts for the implementation of the Programme schemes have been tendered in accordance with the relevant applicable EU procurement legislation, Directives 2014/25/EU, where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the European Union, as and where required.

    Projektstatus

    In Prüfung - 21/05/2021

    Haftungsausschluss

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Tags

    Ungarn Energie