Suche starten De menü ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20200476
    Veröffentlichungsdatum: 16 November 2020

    Projektträger – zwischengeschaltetes Finanzinstitut

    MINISTERE DU CADRE DE VIE ET DU DEVELOPPEMENT DURABLE - REPUBLIQUE DU BENIN

    Ort

    Beschreibung

    Rainwater drainage project for eight secondary cities in Benin (Porto-Novo, Abomey-Calavi, Bohicon, Natitingou, Abomey, Ouidah, Sèmè-Podji, Parakou).

    Ziele

    The project will consist of the extension and rehabilitation of the primary and secondary rainwater drainage systems, as well as of the rehabilitation of the related roads of the concerned cities. The EIB will finance the works for two of the eight cities concerned, Abomey Calavi and Sèmè-Podji. The project will significantly decrease flooding, as well as stagnating water, with a positive impact on human and economic development. It will contribute considerably to improving the living conditions of the population, and to mitigating the effects of climate change. As most of the cities concerned, including Abomey Calavi and Sèmè-Podji, are on the coast or near the coast, the project will also contribute to reducing the amount of plastic waste reaching the Atlantic Ocean.

    Sektor(en)

    • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 110 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 424 million

    Umweltaspekte

    The project's compliance with the applicable national environmental legislation and the EIB's environmental and social principles will be respected, as will the Promoter's procedures for impact assessment and environmental monitoring.

    Auftragsvergabe

    Implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 24/03/2021

    Haftungsausschluss

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Tags

    Benin Wasser, Abwasser