Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20190770
    Veröffentlichungsdatum: 10 März 2020

    Projektträger – zwischengeschaltetes Finanzinstitut

    ACEA SPA

    Ort

    Beschreibung

    Investments in the integrated water sectors in the territory of ATO 2, Rome area

    Ziele

    The project will improve the quality of life of the inhabitants in the city of Rome and 111 surrounding municipalities, by allowing the promoter to upgrade and extend the water and wastewater infrastructures. Furthermore, by increasing the resilience of the water system to climate impacts, the project will contribute to supporting EU Climate Action.

    Sektor(en)

    • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 250 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 698 million

    Umweltaspekte

    The investment is geared toward upgrading water and wastewater infrastructure (water and wastewater treatment plants, networks, pumping stations), bringing about positive environmental impacts. Compliance with the EU Water Framework Directive (2000/60/EC), Urban Waste Water Treatment Directive (91/271/EEC), and EU and national environmental legislation (notably under EIA Directive 2014/52/EU amending the Directive 2011/92/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC) will be verified during appraisal.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been or will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/23/EU where applicable and/or 2014/24/EU where applicable and/or 2014/25/EU where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Unterzeichnet - 30/07/2020

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Wasser, Abwasser