Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20170663
    Veröffentlichungsdatum: 14 Dezember 2017

    Ort

    Beschreibung

    Stage I: Upgrading of railway line and installation of European Train Control System (ETCS) level 2 on the Kelenföld-Százhalombatta section

    Ziele

    The project will increase the quality of rail services provided in Hungary as well as promote travel by rail, thereby enhancing sustainable transport in line with EU objectives. The economic benefits expected are time savings for existing passengers, vehicle operating cost reduction and accident reduction for travellers expected to shift from road to rail as a result of the project. The project offers furthermore some environmental benefits from modal shift of passengers.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 101 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 240 million

    Umweltaspekte

    An environmental impact assessment (EIA) was carried out as required by the EIA Directive for projects covered by Annex I. Following the EIA procedures, including public consultation, the competent authority issued an environmental permit which identifies mitigation measures for environmental impact during the construction period as well as during operation. The project is located close to a Natura 2000 site, the Danube River. The competent authority, however, declared in the environment permit that the project does not have significant impact on the Natura 2000 site.

    Auftragsvergabe

    The Bank will require the promoter to ensure tendering of contracts for the implementation of the project, in accordance with the relevant applicable EU procurement legislation, in particular Directive 2014/24/EU, as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Genehmigt - 16/03/2018

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Ungarn Verkehr