Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20170496
    Veröffentlichungsdatum: 23 Oktober 2018

    Projektträger – zwischengeschaltetes Finanzinstitut

    SNAM 4 MOBILITY SPA,SNAM SPA

    Ort

    Beschreibung

    The project concerns the development of a network of 110 natural gas refueling stations for Compressed Natural Gas (CNG) and Liquefied Natural Gas (LNG) in Italy.

    Ziele

    The project will contribute to a wider European distribution network of CNG and LNG able to push the gradual transition towards a more sustainable refuelling system. The project is in line with EU Directive on Alternative Fuels 2014/94/EU, which has set out minimum requirements for the building-up of alternative fuels infrastructure, including refuelling points for natural gas (CNG and LNG). Half of the refuelling stations are expected to be located along the Trans-European Transport Network (TEN-T) Corridor in Italy and part of the deployed network will be located within the cohesion priority regions of Italy.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 25 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 56 million

    Umweltaspekte

    The project components consist of short connections to the distribution networks and the respective fuelling stations. The stations are using proven technologies. They are expected to have limited environmental impact, which will typically be related to noise nuisance and disturbance during construction and, for a large part of them, to the industrial risks of works implemented on existing fuelling stations. The project components fall under Annex II of Directive 2011/92/EU as amended by 2014/52/EU. The project is not expected to negatively affect the local environment and is thus not expected to require an Environmental Impact Assessment (EIA). However, it is required the project is screened by the respective national authorities for environmental impact including the impact on sensitive areas, which include nature conservation sites. The main benefits of the project are expected on air quality and pollutant emissions with significant reductions of sulphur, particle matter and Nitrogen Oxide (NOx).

    Auftragsvergabe

    The promoter has been assessed by the EIB as being a private company sitting outside regulated activity of its parent company and hence not being subject to EU rules on public procurement or concessions. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation Directive 2014/25/EU or 2004/17/EC, where applicable, then the Bank would require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation 2014/25/EU or 2004/17/EC, where applicable, as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Unterzeichnet - 6/06/2019

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Energie