Veröffentlichungsdatum: 8 November 2016
Projektträger – zwischengeschaltetes Finanzinstitut
ISTANBUL BUYUKSEHIR BELEDIYESIOrt
Beschreibung
The project involves the construction of the 13,4 km-long Atakoy - Ikitelli metro line with 12 new stations on the European side of Istanbul. The new metro line will intersect with six different urban rail systems and provide improved network connections.
Ziele
The project is expected to generate savings in user time, vehicle operating costs, road accident costs, local air/noise emissions as well as a reduction in greenhouse gas emissions as a result of the expected modal shift of passengers from road to rail.
Kommentar(e)
This operation is covered by the EU Guarantee for EIB loans outside the EU.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Not disclosed.
Gesamtkosten (voraussichtlicher Betrag)
Not disclosed.
Umweltaspekte
If situated within the EU, the project would fall under Annex II of Environmental Impact Assessment (EIA) Directive 2011/92/EU and therefore be subject to a screening decision of the competent authority. In this case, the project was screened out based on an environmental assessment prepared in 2015. These documents will be reviewed and assessed during the appraisal to ensure compliance with the EIB's environmental and social standards.
Auftragsvergabe
The Bank will require the promoter to ensure that for works to be financed by the proposed EIB loan, procurement procedures are carried out in accordance with the Bank's Guide to Procurement.
Projektstatus
Unterzeichnet - 22/12/2016
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).