    Referenz: 20110032
    Veröffentlichungsdatum: 7 Dezember 2011

    Projektträger – zwischengeschaltetes Finanzinstitut

    Ministry of Transport of the Czech Republic;
    Managing Authority of the Operational Programme of Transport in the Czech Republic

    Ort

    Beschreibung

    The project consists of the construction of an expressway between Jenišov and Kamenný Dvůr with a total length of 24.85 km. It is part of the TEN-T road between Praha and Schweinfurt (Germany).

    Ziele

    The project contains some 6 km of construction or rehabilitation of lower class roads to ensure an alternative connection to support this section of the R6 in case of occasional closures.

    Kommentar(e)

    Under framework loan.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to CZK 2.7 billion (EUR 108 million)

    Gesamtkosten (voraussichtlicher Betrag)

    CZK 11.5 billion (EUR 458 million)

    Umweltaspekte

    The project falls under Annex I of the EIA Directive 85/337/EEC as amended by Directives 97/11/EC and 2003/35/EC, being subject to an assessment in accordance with Articles 5 to 10 of the EIA Directive. An EIA has already been carried out in 1997-2000 following the legislation in place at that time. The Act No. 244/1992 Coll. on the Environmental Impact Assessment applicable at that moment was managed by the Ministry of the Environment of the Czech Republic.

    Auftragsvergabe

    EU procurement directives (2004/17/EC, 2004/18/EC) have been transposed into Czech legislation by the Act No. 137/2006 Coll. The contract notices for the international open tender were published in the Official Journal of the European Union (OJEU). The main construction contracts for the four lots were published in the OJEU under the reference numbers 2007/S169-208407 (lot 1), 2008/S210-279004 (lot 2), 2008/S233-309389 (lot 3) and 2006/S77-080624 (lot 4). The procurement process is acceptable to the Bank.

    Projektstatus

    In Prüfung - 7/12/2011

    Haftungsausschluss

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).