Veröffentlichungsdatum: 7 Dezember 2011
Projektträger – zwischengeschaltetes Finanzinstitut
Ministry of Transport of the Czech Republic;
Managing Authority of the Operational Programme of Transport in the Czech Republic
Ort
Beschreibung
The project consists of the construction of an expressway between Jenišov and Kamenný Dvůr with a total length of 24.85 km. It is part of the TEN-T road between Praha and Schweinfurt (Germany).
Ziele
The project contains some 6 km of construction or rehabilitation of lower class roads to ensure an alternative connection to support this section of the R6 in case of occasional closures.
Kommentar(e)
Under framework loan.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to CZK 2.7 billion (EUR 108 million)
Gesamtkosten (voraussichtlicher Betrag)
CZK 11.5 billion (EUR 458 million)
Umweltaspekte
The project falls under Annex I of the EIA Directive 85/337/EEC as amended by Directives 97/11/EC and 2003/35/EC, being subject to an assessment in accordance with Articles 5 to 10 of the EIA Directive. An EIA has already been carried out in 1997-2000 following the legislation in place at that time. The Act No. 244/1992 Coll. on the Environmental Impact Assessment applicable at that moment was managed by the Ministry of the Environment of the Czech Republic.
Auftragsvergabe
EU procurement directives (2004/17/EC, 2004/18/EC) have been transposed into Czech legislation by the Act No. 137/2006 Coll. The contract notices for the international open tender were published in the Official Journal of the European Union (OJEU). The main construction contracts for the four lots were published in the OJEU under the reference numbers 2007/S169-208407 (lot 1), 2008/S210-279004 (lot 2), 2008/S233-309389 (lot 3) and 2006/S77-080624 (lot 4). The procurement process is acceptable to the Bank.
Projektstatus
In Prüfung - 7/12/2011