Suche starten De menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20080466
Veröffentlichungsdatum: 12 Oktober 2010

Projektträger – zwischengeschaltetes Finanzinstitut

Ministry of Transport of the Czech Republic;
Managing Authority of the Operational Programme of Transport in the Czech Republic

Ort

Beschreibung

The project consists of the modernisation of two railway sections located on Corridor IV south of Prague. The first scheme is a 24 km long double track electrified line from Benesov u Prahy to Strancice. The second scheme is a 12 km long single track electrified line from Doubi to Tabor.

Ziele

The project corresponds to an optimisation of capacity and performance of the existing infrastructure both for passengers and freight traffic. It also encompasses an improvement of network safety and reliability. The project raises the infrastructure level to EU standards and is a step towards the gradual achievement of interoperability of networks.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Up to CZK 2 254 million.

Gesamtkosten (voraussichtlicher Betrag)

CZK 7 513.5 million.

Umweltaspekte

The project falls under Annex II of Directive 97/11/EC as amended by Directive 2003/35/EC and an EIA has been carried out. All procedural rules, transposed into Law of the Czech Republic (Act 100/2001 Coll.), have been respected. The project crosses two NATURA 2000 sites and the competent authority has confirmed that the project has no significant impacts on the sites.

Auftragsvergabe

EU procurement directives (2004/17/EC, 2004/18/EC) have been transposed into Czech legislation by the Act No. 137/2006 Coll.

The contract notices for the international open tender have been published in the Official Journal of the European Communities (OJEC). The main contracts have been published in the OJEC under the reference number 2006/S 113 0120888 on 16/06/2006 for scheme 1 and S 235 0251095 on 9/12/2006 for scheme 2.

Projektstatus

In Prüfung - 12/10/2010

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Tschechien Verkehr