Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20070471
    Veröffentlichungsdatum: 5 März 2008

    Projektträger – zwischengeschaltetes Finanzinstitut

    The Municipality of Oradea

    Ort

    Beschreibung

    Financing the acquisition of new rolling stock (trams and buses) to be used for city public transport and operated by the local public transport regia (Oradea Transport Local RA), replacing obsolete vehicle fleet.

    Ziele

    The project aims at improving the public transport capacity in Oradea, ensuring increased reliability of operation, better safety and comfort for passengers (including better accessibility for disabled people). It should contribute to a decreased environmental impact with new public transport vehicles characterised by lower CO2 emissions and lower noise pollution.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 20 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 40 million

    Umweltaspekte

    The supply of rolling stock does not fall within the scope of EU environmental aspect assessment regulation. Due to the technical characteristics of the new rolling stock, it is expected that the project could contribute to an overall improvement in the urban environment with modern trams and buses, which are also more energy efficient and environmentally friendly than the ones that they replace (better materials for the construction, lower pollutant emissions, air conditioning, better maintenance materials, lower noise and vibrations during operation).

    Auftragsvergabe

    The promoter is a public entity subject to EU public procurement regulations (Directive 2004/17/CEE) as mirrored in the national public procurement regulations. The Bank will require the promoter to ensure that the contracts under the project have been or shall be tendered in accordance with these regulations, including publication of tender notices in the EU Official Journal.

    Projektstatus

    Unterzeichnet - 12/09/2008

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Rumänien Verkehr