Veröffentlichungsdatum: 13 Mai 2008
Projektträger – zwischengeschaltetes Finanzinstitut
MAV Magyar Allamvasutak ZRT (MAV)
Ort
Beschreibung
The Project comprises the acquisition of up to 50 dual-voltage locomotives for use on domestic and international passenger and freight services replacing older locomotive types.
Ziele
The investment aims at increasing the capacity and quality of national and international passenger and freight services provided by the Hungarian Railways
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
In the order of EUR 75 million.
Gesamtkosten (voraussichtlicher Betrag)
In the order of EUR 150 million (preliminary estimation).
Umweltaspekte
The purchase of railway rolling stock does not fall under EIA Directive 85/337/EEC, amended by Directives 97/11/EC and 2003/35/EC, thus an Environmental Impact Assessment is not required. New rolling stock will conform to modern environmental standards. These include reduced noise and pollution, increased energy efficiency and restrictions on the use of some materials. Overall, the project will have a positive environmental impact.
Auftragsvergabe
The Bank will require the Promoter to ensure, where applicable, that the investments to be financed under the present operation will comply with EU procurement Directives.
Projektstatus
Unterzeichnet - 3/12/2009
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).