Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20070245
    Veröffentlichungsdatum: 16 Juli 2007

    Projektträger – zwischengeschaltetes Finanzinstitut

    Walsall College
    St Paul’s Street
    Walsall WS1 1WY
    United Kingdom
    Contact Name: Jatinder Sharma

    Ort

    Beschreibung

    The project consists of the construction and equipping of a new college facility opposite the existing main site in the town centre. The existing main site, which is in need of upgrading, is to be sold and leased back for three years while the new facility is under construction.

    Ziele

    The project is a core part of an ongoing investment programme at Walsall College to expand, improve and rationalise its infrastructure, in order to provide the student population with improved quality of education and to expand accommodation facilities.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to GBP 9.6 million. (under an existing Education Framework Facility with Barclays Bank plc, London)

    Gesamtkosten (voraussichtlicher Betrag)

    Up to GBP 64.4 million.

    Umweltaspekte

    Council Directive 97/11/EEC on Environmental Impact Assessment (EIA), as amended by 2003/35, does not specifically mention facilities for higher education, but these could in some circumstances be seen as urban development projects. (thus falling under Annex II of the Directive) The project by virtue of its nature, size and location appears unlikely to have a significant effect on environment. The basis for requesting (or not) an EIA by the competent authorities, the local planning and approval process and actual/possible significant impacts on protected flora and fauna (Habitats’ and Birds’ Directives) will be verified during project appraisal.

    Auftragsvergabe

    English Further Education colleges, including Walsall College, are required by the Learning and Skills Council to follow EU procurement guidelines.

    Projektstatus

    In Prüfung - 16/07/2007

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Vereinigtes Königreich Gesundheit