Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20060306
    Veröffentlichungsdatum: 6 Dezember 2006

    Projektträger – zwischengeschaltetes Finanzinstitut

    Huisvuilcentrale Noord-Holland NV
    Jadestraat 1
    PO Box 9199
    NL-1800 GD ALKMAAR

    Ort

    Beschreibung

    Construction and operation of a stand-alone solid biomass combustion unit (wood, waste wood) next to an existing incineration plant. The biomass plant will benefit from a special electricity feed-in tariff granted by the Dutch government to support renewable energy sources.

    Ziele

    The project’s economic interest is linked to its contribution to the EU and national renewable energy targets and climate policies and possibly also to improved waste management and rational use of energy (waste valorisation).

    Kommentar(e)

    Environment

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 40 million.

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 80 million, indicatively.

    Umweltaspekte

    By virtue of its technical characteristics, the project is subject to an EIA according to Annex I of the Directive 85/337/EEC amended 97/11/EC amended 2003/35/EC. An EIA has been carried out and the compent authorities have granted approval. The project may support the reduction targets for biodegradable waste going to landfills (99/31/EC). It contributes to the national objectives concerning electricity produced from renewable energy sources as given in Directive 2001/77/EC.

    Auftragsvergabe

    Procurement procedures appear to be in line with the requirements of the European Utilities Directive 2004/17/EC as the promoter has published a tender notice in the OJEU (2005/S-162-162048) covering the works and supplies of the project concerned.

    Projektstatus

    Unterzeichnet - 19/03/2007

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Niederlande Energie Müllbeseitigung