Veröffentlichungsdatum: 28 September 2004
Projektträger – zwischengeschaltetes Finanzinstitut
SPV in charge of implementing first the feasibility study and possibly at a later stage, the industrial project: “El Aouj S.A.”, Mauritanian subsidiary of “Sphere Investments Limited” (Australia).Ort
Beschreibung
Financing of a bankable feasibility study (BFS) on the exploitation of the Guelb el Aouj iron ore deposit, located 35 km from SNIM’s existing mining operations.
Ziele
The BFS should enable the promoter or any other investor to decide whether it is worth proceeding with the establishment of a new iron ore mine and subsequent processing infrastructure designed to produce DR (Direct Reduction) grade pellets possibly destined to the DR markets in North Africa and the Middle East.
Kommentar(e)
Mining and Quarrying.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Maximum EUR 5m from Investment Facility Resources, to be financed under the EUR 30m IF global authorisation approved in December 2003.
Gesamtkosten (voraussichtlicher Betrag)
USD 11m.
Umweltaspekte
An environmental impact study, including a management plan on environmental aspects and a preliminary closing plan will be part of the feasibility study. Considering the location and not very harmful techniques of the project, no major problem is foreseen.
Auftragsvergabe
The various components of the study which are for the most part specialized in nature as well as the preparation of the final report will be contracted out in direct negotiations.
Projektstatus
Unterzeichnet - 10/02/2005
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).