Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20020391
    Veröffentlichungsdatum: 18 Februar 2003

    Projektträger – zwischengeschaltetes Finanzinstitut

    Autobahnen- und Schnellstrassen-Finanzierungs-AG (“ASFINAG”)

    Ort

    Beschreibung

    Design, build, finance and operation, over a 11.5 year concession period (including 1.5 years for construction), of a toll collection system for heavy vehicles (>3.5 tons) driving on the motorway network in Austria (some 2 100 km in total length).

    Ziele

    The main objective of the project is to charge heavy goods vehicles according to the cost which they cause to the Austrian motorways. Thereby the project aims at encouraging a more efficient use of the motorway network (e.g. improved utilization of vehicle capacities) as well as the shift of freight transport from road to rail and inland waterways.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    About EUR 130 million.

    Gesamtkosten (voraussichtlicher Betrag)

    About EUR 260 million.

    Umweltaspekte

    Although there is not any specific European Directive applicable to the technology related to this project (very low electromagnetic radiation power), its widespread magnitude leads to recommend a case-by-case consideration of Directives 97/11 (Annex II) and 92/43 (Natura-2000) in relation to the installation of gantries during the detailed design phase, namely in terms of potential impacts on the landscape.

    Auftragsvergabe

    The project has been procured and awarded in conformity with relevant EU Directives, but details related to this process will be examined during appraisal. Under these conditions, the procurement procedures followed by the promoter are suitable for the project and satisfactory to the Bank.

    Projektstatus

    Unterzeichnet - 2/12/2004

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Österreich Verkehr