300 000 000 €
Pays
Secteur(s)
Brésil : 300 000 000 €
Énergie : 300 000 000 €
Date(s) de signature
3/07/2025 : 300 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
17 juillet 2025
Statut
Référence
Signé | 03/07/2025
20230454
Nom du projet
Promoteur – Intermédiaire financier
NEOENERGIA ELECTRICITY DISTRIBUTION III
COMPANHIA DE ELETRICIDADE DO ESTADO
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 300 million
EUR 1156 million
Lieu
Secteur(s)
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Description
Objectifs

The loan will support an investment programme to upgrade and expand Neoenergia Coelba's electricity distribution network, Iberdrola's subsidiary, in Bahia, Brazil. The project comprises the extension, refurbishment and modernisation of lines, substations, control and protection systems, automatisation and measures to reduce commercial losses.

The aim is to improve the reliability of the electricity distribution network in the affected areas, upgrade and expand its capacity, make it easier for new users—most likely low-income households and renewable energy producers—to connect, and reduce both technical and commercial losses..

Additionality and Impact

The Programme comprises the extension, refurbishment and modernisation of the electricity distribution grid in Brazil, improving the quality and reliability of electricity supply as well as enabling the connection of new system users, including renewable generators and low-income populations. The Brazil strategic plan PDE 2034, published by the Ministry of Mines and Energy (MME), lays out ambitious goals for energy efficiency and renewable energy over the next decade, to which this project will strongly contribute.


From a policy standpoint, the Programme is of strategic importance for EU - framed under the Global Gateway Investment Agenda -, as it strongly contributes to the objectives set forth in the Multi Annual Indicative Programme (MIP) of cooperation between the EU, as well as Latin America and the Caribbean, especially the objectives of renewable energy and green transition. It supports the Bank's lending priority objectives on Energy (Energy Networks) as well as the transversal objective on Climate Action (mitigation and adaptation).


Moreover, it strongly supports Brazil's Non Determined Contributions, in the context of the Paris Agreement.


EIB financing to the Project will contribute to addressing market failures that may result in sub-optimal investments. These include negative environmental externalities and the need to ensure security of electricity supply, which has valuable public-good attributes. The investment programme will enable the connection of new users, improve the reliability of supply and support further decarbonisation of the power mix.

The Programme contributes to the achievement of the UN 2030 Agenda in particular with contribution to several Sustainable Development Goals (5,7,8,9,10,11,13,17).


The Project's overall economic viability is expected to be above the regulated financial rate of return, thus is expected to deliver a positive broader social benefit. The promoter is an experienced utility operator of electricity distribution networks and has the necessary capacity to manage the implementation of the Project and operate the assets over the term of the loan. Overall, the Project quality and results is expected to be Very Good.


The Bank's financial contribution is considered valuable to the client, as the EIB's offering provides more flexible conditions compared to market alternatives (e.g. longer tenor and grace period).

Aspects environnementaux
Passation des marchés

The majority of the envisaged Project schemes for the implementation of electricity distribution networks are exempt (voltage below 69 KV or a length of less than 20 Km) from the Environmental License, in accordance with CEPRAM Resolution No 4119/2010 and Decree No 18218 of 26 January 2018, amending the Regulation of Law No 10.431 of 20 December 2006. The investments are expected to be mainly in urban and sub-urban areas therefore no major environmental or social impacts are expected. Nonetheless, the EIB will assess the promoter's capacity and procedures to ensure the projects' compliance with applicable national environmental, legislation, as well as with the EIB's Environmental and Social Standards.

The promoter shall ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement. Information on awarded main suppliers/contractors for the implementation of the envisaged operation will be provided during the appraisal.

Milestone
À l'examen
Approuvé
Signé
31 mars 2025
3 juillet 2025
Lien vers la source
Autres liens

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - NEOENERGIA ELECTRICITY DISTRIBUTION III
Date de publication
17 Jul 2025
Langue
Sujet général
Prêts
Numéro du document
226591664
Thématique du document
Information Environnementale
Numéro du projet
20230454
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes