Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
300 000 000 €
Pays
Secteur(s)
Roumanie : 300 000 000 €
Transports : 300 000 000 €
Date(s) de signature
7/01/2025 : 300 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
29 septembre 2023
Statut
Référence
Signé | 07/01/2025
20220881
Nom du projet
Promoteur – Intermédiaire financier
CARANSEBES-ARAD RAILWAY - RRF CO-FINANCING
ROMANIA
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 300 million
EUR 1758 million
Lieu
Secteur(s)
Description
Objectifs

The project consists of upgrading 155 km of existing single-track electrified railway line, including doubling of the whole length between Arad and Caransebes. The railway line is part of both the Rhine-Danube and the Orient/East-Med Core TEN-T Corridors. The upgrading of the mixed traffic (passenger and freight) railway line includes an increase of maximum design speed (160 km/h for passenger trains and 120 km/h for freight trains), axle load and maximum permissible train length, as well as installation of European Railway Traffic Management System (ERTMS) level 2 in order to bring the project in compliance with the relevant Technical Specifications for Interoperability (TSIs).

The project is located in an EIB Cohesion Priority Region and the railway is on the core Trans European Transport Network (TEN-T). The project will be compliant with the Technical Specifications for Interoperability (TSIs), including installation of European Rail Traffic Management System. The project will significantly improve the quality and travel time of the rail connection between Arad and Caransebes and is expected to result in time savings as well as in some modal shift from road to rail with the corresponding vehicle operating cost savings, transport safety improvements and environmental benefits in terms of reduction of noise, GHG emissions and pollution.

Additionality and Impact

The project consists of upgrading and doubling of 162 km of railway line, between Arad (about 30 km East of the HU/RO border) and Caransebes. The line is part of both the Rhine-Danube and the Orient/East-Med Core TEN-T Corridors and connects to other major Romanian cities on the eastern side, such as Craiova, Bucharest and Constanta continuing on the Rhine-Danube TEN-T Corridor as well as to Calafat/Vidin (RO/BG border) on the south-eastern side on the Orient/East-Med TEN-T Corridor. The northern end of the project alignment, continuing from Arad on the Rhine-Danube TEN-T Corridor, is connected to the RO/HU border and hence to Budapest and western Europe.

The Project, located in Western Romania (a less developed region), is expected to reduce journey times and consequently strengthen socio-economic dynamism as well as contributing to the improved accessibility of both urban areas as well as other parts of the region.

The shift of passenger and freight traffic to rail addresses market failures by minimising a number of transport externalities, such as the harm to humans in terms of accidents and loss of life, or environmental externalities such as noise, pollution and CO2 emissions.

The project is expected to be 100% eligible under Climate Action and Environmental Sustainability. JASPERS provided limited technical advice on the feasibility study and the Bank provides project implementation to CFR and Managing Authority through the Project Advisory Support Unit (PASU) located in Bucharest. In addition to the technical assistance, the EIB contribution to the operation in terms of long term financing and more favourable financial conditions in comparison to the financial market, will provide a substantial value added. The EIB loan is expected to leverage RRF funds amounting to EUR 1,155m thus contributing to the project acceleration.


Aspects environnementaux
Passation des marchés

The project falls under Annex I of the Environmental Impact Assessment Directive (EIA) 2011/92/EU amended by Directive 2014/52/EU. The environmental impacts of the project, the EIA procedure and the need for assessment according to the Habitats Directive 92/43/EEC will be analysed during the appraisal. The project will significantly improve the rail connection between Arad and Caransebes and is expected to result in modal shift from road and to rail with the corresponding environmental benefits in terms of reduction of noise, GHG emissions and pollution. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation and pollution prevention and control.

The Bank will require the promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
À l'examen
Approuvé
Signé
6 février 2024
7 janvier 2025
Lien vers la source
Autres liens

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Évaluation des incidences environnementales et sociales - CARANSEBES-ARAD RAILWAY - RRF CO-FINANCING - RAPORT DE IMPACT ASUPRA MEDIULUI
Date de publication
22 Nov 2023
Langue
Sujet général
Prêts
Numéro du document
179935678
Thématique du document
Information Environnementale
Numéro du projet
20220881
Secteur(s)
Pays
Disponible au public
Télécharger maintenant
Fiche technique sur les aspects sociaux et environnementaux - CARANSEBES-ARAD RAILWAY - RRF CO-FINANCING
Date de publication
1 Mar 2024
Langue
Sujet général
Prêts
Numéro du document
177737739
Thématique du document
Information Environnementale
Numéro du projet
20220881
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes