Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20180127
    Date de publication: 24 juillet 2018

    Promoteur – Intermédiaire Financier

    REPUBLIC OF UZBEKISTAN

    Lieu

    Description

    The project will support improvements in water supply as well as wastewater collection and treatment in Uzbekistan.

    Objectifs

    One of the most important and imminent bottlenecks for the Uzbekistan economy is water supply. The project aims at relieving constraints on water supply by improving the quality of water and enhancing the coverage and efficiency of wastewater networks. The ultimate aim of the project is in line with the UN Sustainable Development Goals number 6 (water and sanitation for all) and number 13 (climate action). The project will also contribute to EU objectives included in the Regional Multi-Annual Indicative Programme 2014-2020 for Central Asia as well as the EU's bilateral cooperation programme which is seeking to improve drinking water supply and sanitation in Uzbekistan. Furthermore, the investments are in line with the Government's "Program for the Comprehensive Development and Modernization of Water Supply and Sewerage Systems, 2017-2021" , as they aim at improving access to drinking water and sanitation. The schemes will have a positive socio-economic impact in the cities and improve the quality of life for the citizens.

    Commentaires

    The proposed operation is a loan supporting investments in the water sector in Uzbekistan complementing the World Bank's "Water Services and Institutional Support Program".

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 100 million

    Coût total (montant approximatif)

    EUR 290 million

    Aspects environnementaux

    Significant environmental or social risks are not expected at this stage. However, compliance with the Bank's environmental and social standards will be assessed during the subsequent individual scheme allocation appraisals. The schemes are expected to have some minor environmental impacts during construction and no negative residual impact in the operational phase. The project's residual negative impacts during construction and operation are limited and offset by these expected positive impacts. The project is not likely to have any negative impacts on nature conservation areas, as schemes are mostly located in a consolidated urban environment and on the existing main routes of water mains and sewers and in the premises of existing facilities. Nevertheless, compliance with the Birds and Habitats Directives will be further checked during appraisal of individual schemes during the implementation of the project and before allocating finance to schemes.

    Passation des marchés

    If located in the European Union, the Promoter would fall under the scope of Directive 2014/24/EU on public procurement. The project is therefore considered as an operation in the public sector and the Promoter needs to comply with the relevant sections of the EIB's Guide to Procurement. A procurement plan is not yet available at the time of appraisal and will be requested by the Bank and approved at scheme allocation. Procurement has not started and is planned to start in late 2018. Open and/or restricted tender procedures are envisaged with publication in the Official Journal of the European Union (OJEU), as and when required. It is expected that almost all works contracts and most of the services contracts will be subject to this procedure.

    Statut

    Signé - 5/10/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Ouzbekistan Eau, assainissement