Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20160398
    Date de publication: 25 juillet 2016

    Promoteur – Intermédiaire Financier

    AQUAFIN NV

    Lieu

    Description

    The project comprises schemes for the construction of collector sewers, storm overflows and small and medium-sized wastewater treatment plants, plus some upgrading of existing wastewater treatment plants for tertiary treatment in the Flemish region. Implementation of the sub-projects is planned for 2017-2020.

    Objectifs

    The project will improve and expand the existing infrastructure for wastewater collection and treatment. The works included in the project aim at cost-efficient solutions to comply with the mandatory environmental requirements.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 200 million

    Coût total (montant approximatif)

    EUR 454 million

    Aspects environnementaux

    The Flemish region has been meeting the requirements of the Urban Wastewater Directive since 2012. The operation will support the region to keep this compliance as well as to improve the quality of wastewater services provided. Aquafin has a good environmental awareness and has developed operating procedures to optimise the performance and cost-effectiveness of its systems. So far, it has demonstrated in the previous operations with the Bank that it fully complies with the Environmental Impact Assessment, Birds and Habitats Directives.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EC and Dir 2007/66/EC) with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 13/02/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Belgique Eau, assainissement